OKTAVIANY, KENNY and Damiri, Dhami Johar (2022) ANALISIS PENURUNAN SUSUT TEKNIS MELALUI PENYEIMBANGAN BEBAN GARDU DISTRIBUSI DAN PERBAIKAN OVERLOAD DENGAN MENGGUNAKAN METODE UPRATING TRAFO PADA GARDU PMDS 0194 DI PT.PLN (PERSERO) ULP RAJAPOLAH. Diploma thesis, ITPLN.
PROYEK AKHIR_KENNY OKTAVIANY_201971033_KENNY oktaviany.pdf
Restricted to Registered users only
Download (3MB)
Abstract
Listrik adalah sumber daya utama untuk kegiatan sehari-hari di masyarakat. Dengan pesatnya peningkatan pasokan listrik, kualitas listrik itu sendiri harus seimbang. Dalam proses bisnis PLN adalah meningkatkan penjualan dan kehandalan. Salah satunya adalah kualitas dari trafo PLN itu sendiri dimana pada PT.PLN (Persero) Unit Layanan Pelanggan Rajapolah memiliki persentase ketidakseimbangan beban gardu distribusi PMDS 0195 yang melebihi standar persentasi beban trafo melebihi standar pembebanan transformator sebesar 80 % atau biasa dikatakan tarfo mengalami overload dan ditemukan bahwa pembebanan masing-masing fasa yang tidak sama dimana standar persentase ketidakseimbangan maksimal sebesar 10 %. Sehingga, dilakukannya uppreting tarfo yaitu mengganti kapasitas trafo dari 100 kVA menjadi 160 kVA dan dilakukannya penyeimbangan beban trafo.Didapatkan nilai persentase beban transformator sebelum Uprating transformator adalah 106%, dan nilai persentase beban transformator setelah Uprating adalah 65,08%, terjadi penurunan sebesar 40,92%. Penyeimbangan beban dengan memindahkan fasa yang tinggi ke fasa yang rendah didapatkan melakukan pengukuran pada siang hari susut awal sebesar 3,1% menjadi 0,5% dimana dapat menurunkan susut sebesar 2,6%. Ketika di lakukan kembali pengukuran pada malam hari susut awal sebesar 4,09%, menjadi 0,875% dimana dapat menurunkan susut sebesar 3,215%.
Electricity is the main resource for daily activities in society. With the rapid increase in electricity supply, the quality of electricity itself must be balanced. In PLN's business process is to increase sales and reliability. One of them is from the PLN transformer itself where at PT. PLN (Persero) the Rajapolah Customer Service Unit has a balanced proportion of the quality of the PMDS 0195 distribution substation which exceeds the standard percentage of the transformer load exceeding the standard transformer loading by 80% or it is usually said that the transformer is overloaded and it is found that the loading of each phase is the same where each phase is the same according to the maximum proportion is 10%. transformer load balancing. The transformer load proportion value before Uprating the transformer is 106%, and the transformer load proportion after Uprating is 65.08%, there is a decrease of 40.92% Load balancing by moving a high phase to a low phase is obtained by measuring during the day the initial shrinkage is 3.1% to 0.5% which can reduce shrinkage by 2.6%. When the measurement is carried out again at night, the initial shrinkage is 4.09%, to 0.875% which can reduce shrinkage by 3.215%.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | Overload, Upreting, ketidakseimbangan Overload, Upreting, Imbalance |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Tenaga Listrik |
| Divisions: | Vokasi > D3 Teknologi Listrik |
| Depositing User: | Sudarman |
| Date Deposited: | 07 Apr 2026 03:24 |
| Last Modified: | 07 Apr 2026 03:24 |
| URI: | https://repository.itpln.ac.id/id/eprint/6369 |