MAHARDIKAN, EMBUN and junaidi, andi (2022) EVALUASI KORDINASI PROTEKSI PADA JARINGAN DISTRIBUSI TEGANGAN MENENGAH PADA PENYULANG WBO 09 PT PLN (Persero) UP3 PURWOKERTO. Diploma thesis, ITPLN.
PROYEK AKHIR_EMBUN MAHARDIKAN_201971053_EMBUN MAHARDIKAN.pdf
Restricted to Registered users only
Download (2MB)
Abstract
Suatu sistem proteksi pada saluran udara tegangan menengah (SUTM) 20 kV merupakan hal yang sangat penting, karena sistem proteksi dapat mencegah terjadinya gangguan pada penyulang. Proteksi yang berkerja secara baik dan dapat menentukan keandalan suatu jaringan. Sistem proteksi yang harus diperhatikan kinerjanya salah satunya adalah rele arus lebih (OCR), dan rele gangguan tanah (GFR). Perlunya dilakukan evaluasi pada rele tersebut, karena pada penyulang WBO09 terdapat kegagalan kerja pada rele gangguan tanah (GFR) yang menyebabkan meluasnya daerah padam. Settingan rele proteksi sebelumnya pada penyulang WBO 09 di recloser ke 2 tidak bekerja, dikarnakan setting rele proktesi yang dilakukan tidak sesuai dengan besaran arus gangguan hubung singkat yang terjadi. Oleh karena itu perlu dilakukan setting ulang rele proteksi sesuai dengan perhitungan arus gangguan hubung singkat. Setelah deketahui besaran arus gangguan hubung singkat maksimum maka dapat digunakan sebagai refrensi dalam menentukan nilaisetting yang akan digunakan, Di dapat hasil dari perhitungan arus hubung singkat untuk evaluasi kordinasi pada setting recloser 1 pada relay OCR TMS sebesar 0,17 Iset 380A GFR TMS sebesar 0,19 Iset 130A. pada setting recloser 2 pada relay OCR TMS sebesar 0,08 Iset 300A GFR TMS sebesar 0,10 Iset 100A.
A protection system for medium-voltage overhead line (SUTM) 20 kV is very important, because the protection system can prevent interference in the feeder. Protection that works well and can determine the reliability of a electricity network. One of the protection systems that must be considered is the overcurrent relay (OCR) and the ground fault relay (GFR). It is necessary to evaluate the relay, because in the WBO09 feeder there is a work failure on the ground fault relay (GFR) which causes widespread outages. The previous protection relay settings on the WBO 09 feeder on the 2nd recloser did not work, because the protection relay settings were not in accordance with the amount of short circuit fault current that occurred. Therefore, it is necessary to reset the protection relay in accordance with the calculation of the short-circuit fault current. After knowing the maximum short-circuit fault current, it can be used as a reference in determining the setting value to be used. The results of the short-circuit current calculation for the evaluation of the coordination on the recloser 1 setting on the OCR TMS relay are 0.17 Iset 380A GFR TMS is 0, 19 Iset 130A. on the recloser 2 setting on the OCR TMS relay of 0.08 Iset 300A GFR TMS is 0.10 Iset 100A.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | Protection System, GFR, OCR, Electrical Network, Short Circuit Interference Sistem Proteksi , GFR, OCR, Jaringan Listrik, Gangguan Hubung Singkat |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Tenaga Listrik |
| Divisions: | Vokasi > D3 Teknologi Listrik |
| Depositing User: | Sudarman |
| Date Deposited: | 20 Apr 2026 02:25 |
| Last Modified: | 20 Apr 2026 02:25 |
| URI: | https://repository.itpln.ac.id/id/eprint/6411 |