PERENCANAAN PENAMBAHAN DAYA 17 MVA PADA GARDU INDUK JATAKE II MENUJU GARDU DISTRIBUSI PT.HENGDA STEEL

SIHOMBING, EL KHANA ABURYZAL and Suyanto, Heri (2022) PERENCANAAN PENAMBAHAN DAYA 17 MVA PADA GARDU INDUK JATAKE II MENUJU GARDU DISTRIBUSI PT.HENGDA STEEL. Diploma thesis, ITPLN.

[thumbnail of Proyek Akhir_EL KHANA ABURYZAL_201971054_El Khana Aburyzal.pdf] Text
Proyek Akhir_EL KHANA ABURYZAL_201971054_El Khana Aburyzal.pdf
Restricted to Registered users only

Download (2MB)

Abstract

Sehubungan bersama meningkatnya kuantitas bangunan dan penduduk di tempat wilayah Cikokol, tangerang maka tingkat kebutuhan energi listrik yang dibutuhkan industri dan pelanggan baru tambah meningkat. Pada penelitian ini dilakukan perencanaan penambahan daya pada pelanggan PT.Hengda Steel. Dari simulasi yang dilakukan penambahan daya pada PT. Hengda Steel sebesar 17 MVA dapat dilakukan, diperoleh nilai Losses didapat nilai 69,8 kW dengan nilai kVAR -77.3 dengan nilai persentase pada Bus Voltage dari 103,4% ke 102,4% dengan drop tegangan 1,07%.Dari penelitian yang dilakukan Gardu Induk Maximangando tidak dapat memenuhi penambahan suplai daya dari hasil perhitungan pada Trafo I diperoleh 104,4858% dan Trafo II diperoleh 98,9548%. Dimana nilai presentase pembebanan yang dihasilkan melebihi kapasitas standar yang telah ditetapkan, oleh karena itu dilakukan pengalihan suplai dari Gardu terdekat yaitu Gardu Induk Jatake II, yang setelah dilakukan pembebanan pada Trafo I diperoleh 58,7019% dan Trafo II diperoleh 72,0272%. dapat disimpulkan bahwa presentase pembebanan trafo pada Gardu Induk Jatake II telah memenuhi standar yang telah ditetapkan untuk melakukan penambahan daya 17 MVA pada pelanggan PT. Hengda Steel.

In connection with the increasing number of buildings and residents in the Cikokol area, Tangerang, the level of electrical energy needed by industry and new customers is increasing. In this research, planning to add power to the customers of PT.Hengda Steel. From the simulation carried out the addition of power at PT. Hengda Steel of 17 MVA can be done, the Losses value obtained is 69.8 kW with a kVAR value of -77.3 with a percentage value on Bus Voltage from 103.4% to 102.4% with a voltage drop of 1.07%. From the research conducted Maximangando Substation cannot meet the additional power supply from the calculation results in Transformer I obtained 104.4858% and Transformer II obtained 98.9548%. Where the percentage value of the resulting load exceeds the standard capacity that has been set, therefore a supply transfer from the nearest substation is carried out, namely the Jatake II Substation, which after loading on Transformer I obtained 58.7019% and Transformer II obtained 72.0272%. it can be concluded that the percentage of transformer loading at the Jatake II Substation has met the standards that have been set for adding 17 MVA power to PT. Hengda Steel.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Planning, Loading, Cable, Percentage. Perencanaan, Pembebanan, Kabel, Persentase.
Subjects: Skripsi
Bidang Keilmuan > Teknik Tenaga Listrik
Divisions: Vokasi > D3 Teknologi Listrik
Depositing User: Sudarman
Date Deposited: 20 Apr 2026 02:28
Last Modified: 20 Apr 2026 02:28
URI: https://repository.itpln.ac.id/id/eprint/6412

Actions (login required)

View Item
View Item