ANALISA KINERJA CIRCUIT BREAKER OUTGOING (CBO) PADA PENYULANG AMONIAK DAN PENYULANG BIBIR DI PT PLN (PERSERO) UP3 TANJUNG PRIOK

PANGESTI, ANISYA DWI WIDIA and Erlina, Erlina (2022) ANALISA KINERJA CIRCUIT BREAKER OUTGOING (CBO) PADA PENYULANG AMONIAK DAN PENYULANG BIBIR DI PT PLN (PERSERO) UP3 TANJUNG PRIOK. Diploma thesis, ITPLN.

[thumbnail of PROYEK AKHIR_ANISYA DWI WIDIA PANGESTI_ 20197_ANISYA DWI WIDIA PAN.pdf] Text
PROYEK AKHIR_ANISYA DWI WIDIA PANGESTI_ 20197_ANISYA DWI WIDIA PAN.pdf
Restricted to Registered users only

Download (2MB)

Abstract

Penelitian analisa kinerja Circuit Breaker Outgoing (CBO) pada Penyulang Amoniak dan Penyulang Bibir di PT PLN (Persero) UP3 Tanjung Priok dilaksanakan berdasarkan tinjauan gangguan penyulang yang dialami seperti gangguan internal dan gangguan eksternal. Sebagai langkah antisipasi adanya potensi gangguan tersebut, maka dilakukan pemasangan Circuit Breaker Outgoing (CBO) pada middle point (titik tengah) penyulang (feeder) jaringan tegangan menengah 20 kV. Hal ini bertujuan untuk memberikan pengamanan terhadap jaringan agar memudahkan recovery time akibat gangguan semakin cepat penanganannya. Namun demikian dikarenakan keterbatasan anggaran dan belum bisa terealisasinya pemasangan CBO di 3 penyulang yaitu Penyulang Bibir, Gigi, dan Magnesium. Metode perhitungan yang digunakan dalam penelitian ini menggunakan parameter ENS kWh dan Rupiah serta recovery time. Berdasarkan hasil perhitungan ENS kWh Penyulang Amoniak yang dipasang CBO sebesar 956,958 kWh dan ENS Rupiah sebesar Rp.1.382.517,- jika harga listrik PLN per kWh bulan januari – maret 2021 adalah Rp.1.444,70 dengan waktu pengusutan gangguan 30 menit. Kemudian untuk Penyulang Bibir yang belum terpasang CBO berdasarkan hasil perhitungan ENS kWh sebesar 2105,307 kWh dan ENS Rupiah sebesar Rp.3.041.538,- jika harga listrik PLN per kWh bulan juli – september 2021 adalah Rp.1.444,70 dengan lama waktu penguustan gangguan 1 jam 18 menit.

Research on the performance analysis of Circuit Breaker Outgoing (CBO) on ammonia refiners and lip refiners at PT PLN (Persero) UP3 Tanjung Priok was carried out based on a review of refiner disturbances experienced such as internal disturbances and external disturbances. As a step to anticipate the potential for this disturbance, the installation of an (CBO) was carried out at the middle point (midpoint) feeder of the 20 kV medium voltage network. This aims to provide security to the network to facilitate recovery time due to disruptions, the faster it is handled. However, due to budget constraints and the unrealization of CBO installation in 3 refiners, namely Lip, Dental, and Magnesium refiners. The calculation method used in this study used ENS kWh and Rupiah parameters as well as recovery time. Based on the calculation results of the ENS kWh of ammonia refineries installed by CBO of 956,958 kWh and ENS Rupiah of Rp.1,382,517,- if the price of PLN electricity per kWh in January - March 2021 is Rp.1,444.70 with a disturbance linkage time of 30 minutes. Then for lip refiners that have not been installed CBO based on the calculation results of ENS kWh of 2105,307 kWh and ENS Rupiah of Rp.3,041,538,- if the price of PLN electricity per kWh in July – September 2021 is Rp.1,444.70 with a duration of 1 hour 18 minutes of disturbance.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: CBO, JTM, Penyulang. CBO, JTM, Feeder.
Subjects: Skripsi
Bidang Keilmuan > Teknik Tenaga Listrik
Divisions: Vokasi > D3 Teknologi Listrik
Depositing User: Sudarman
Date Deposited: 20 Apr 2026 03:51
Last Modified: 20 Apr 2026 03:51
URI: https://repository.itpln.ac.id/id/eprint/6429