Perkembangan pembangunan toko di kota Makassar tepatnya di Gowa mengalami peningkatan sangat pesat. Hal ini mendorong permintaan energi listrik semakin bertambah. Untuk mengatasi masalah tersebut maka perlu dilakukan perencanaan yang baik dalam membangun suatu jaringan distribusi baru sehingga pembangunan, pengoperasian dan pemeliharaan sistem listrik berjalan dengan baik. Suatu Perencanaan sistem distribusi harus dilaksanakan secara sistematik dengan pendekatan yang didasarkan pada peramalan beban untuk memperoleh suatu pola pelayanan yang optimal, Metode yang digunakan pada penelitian ini yaitu menggunakan metode kuantitatif adalah penelitian ini berangkat dari data, Ada beberapa perhitungan beban dalam melakukan perencanaan yaitu perhitungaan beban pelanggan, karakteristik beban, penetuan kapasitas NH-Fuse dan Fuse link, serta pemilihan lokasi gardu distribusi . Pada penelitian ini besar daya permintaan penyambungan baru pada toko Grand Toserba Gowa, sebesar 197 kVA. Dari hasil data yang didapatkan dengan luas lahan 170 meter, dengan total daya pelanggan sebesar 54.400 kVA dan dengan kapasitas transformator yang digunakan minimal 68 kVA , pemilihan penghantar saluran kabel SKTM penyulang Cheng Ho hingga Gardu yang dibangun menggunakan jenis kabel AAACS 150 mm2 sedangkan untuk jaringan tegangan rendahnnya menggunakan jenis SKUTR dan digunakan kabel AAACS dengan ukuran 70mm2 , dikapasitas NH-Fuse dipilih NH- Fuse dengan rating dibawah kemampuan hantar arus kabel TR dengan kabel pilin 3x70 (mm2) +N =170 A dipilih NH-Fuse 160 Ampere. dan dikapasitas Fuse Link dipakai tipe -T 12,5 Ampere.
The development of shop construction in the city of Makassar, precisely in Gowa, has increased very rapidly. This encourages the demand for electrical energy to increase. To overcome these problems, it is necessary to do good planning in building a new distribution network so that the construction, operation and maintenance of the electrical system goes well. A distribution system planning must be carried out systematically with an approach based on load forecasting to obtain an optimal service pattern. The method used in this study is to use quantitative methods. This research departs from data. There are several load calculations in planning, namely load calculations. customers, load characteristics, determination of NH-Fuse and Fuse link capacities, and selection of distribution substation locations. In this study, the demand for new connections at the Grand Toserba Gowa store is 197 kVA. From the results of the data obtained with a land area of 170 meters, with a total customer power of 54,400 kVA and with a transformer capacity of at least 68 kVA, the selection of conductors for the SKTM cable channel for the Cheng Ho feeder to the substation which was built using AAACS cable type 150 mm2 while for the voltage network The low level uses the SKUTR type and AAACS cable with a size of 70mm2 is used, the NH-Fuse capacity is selected NH-Fuse with a rating below the current-carrying ability of TR cable with twisted cable 3x70 (mm2) +N = 170 A selected NH-Fuse 160 Ampere. and the Fuse Link capacity is used type -T 12.5 Ampere.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | Jaringan Distribusi, Perencanaan,Energi Listrik Distribution Network, Planning, Electrical Energy |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Tenaga Listrik |
| Divisions: | Vokasi > D3 Teknologi Listrik |
| Depositing User: | Sudarman |
| Date Deposited: | 20 Apr 2026 04:08 |
| Last Modified: | 20 Apr 2026 04:08 |
| URI: | https://repository.itpln.ac.id/id/eprint/6436 |