ALDIANUR, ANAS and Tambunan, Juara Mangapul (2022) STUDI PERENCANAAN SISTEM KELISTRIKAN PADA APARTEMEN THE STATURE JAKARTA. Diploma thesis, ITPLN.
PROYEK AKHIR_ANAS ALDIANUR_201971040_ANAS ALDIANUR.pdf
Restricted to Registered users only
Download (9MB)
Abstract
Perencanaan instalasi listrik pada gedung harus dilaksanakan melalui suatu sistem perencanaan yang baik dan berkualitas untuk mendapatkan efektifitas kinerja dari instalasi listriknya dan efesiensi dari pelaksanaan konstruksi instalasi listrik, namun perencanaan instalasi listrik gedung juga mempertimbangkan kemungkinan jika terjadi kerusakan dan adanya renovasi pada masa mendatang. Sehubungan dengan adanya pembangunan Apartemen the stature di jakarta yang terdiri dari 32 lantai dan 1 atap yang mana pada lantai 8 sampai 23 masing-masing memiliki 9 buah unit, untuk itu perencanaan instalasi listrik gedung ini harus dilaksanakan secara cermat, akurat, dan teliti dengan mengikuti prosedur perencanaan instalasi listrik bangunan bertingkat tinggi. Perencanaan beban listrik kerja sebesar 1280 KVA, sehingga kapasitas transformator step down yang digunakan sebesar 1600 KVA dengan daya sebesar 1440 Kva atau sebesar 90 %. Untuk Pengaman yang digunakan pada masing – masing unit adalah jenis MCB 1 fasa dengan rating 60 A dan 100 A. Perencanaan instalasi listrik gedung bertingkat tinggi meliputi merencanakan sistem pembagian daya, menghitung beban Listrik, menghitung dan menentukan penghantar, menghitung dan menentukan pengaman, menentukan pembagian beban fasa R, S dan T serta menentukan kapasitas transformator. Oleh sebab itu perencanaan sistem instalasi listrik gedung apartemen ini harus mengacu pada peraturan dan ketentuan yang berlaku sesuai dengan PUIL 2011.
Planning for electrical installations in buildings must be carried out through a good and quality planning system to get the effectiveness of the performance of electrical installations and efficiency of the implementation of electrical installations construction, but the planning of electrical installations also considers the possibility of damage and its presence in the future. In connection with the construction of the Stature Apartment in Jakarta, which consists of 32 floors and 1 roof which on floors 8 to 23 each has 9 units, for this reason the electrical installation planning of this building must be carried out carefully, accurately, and thoroughly by following procedures electrical installation planning of high-rise buildings. The electrical load planning is 1280 KVA, so the capacity of the step down transformer used is 1600 KVA with a power of 1440 KVA or 90%. For the safety used in each 1-phase MCB unit with a rating of 60 A and 100 A. The planning of the electrical installation of a multi-storey building includes planning the power distribution system, calculating the electrical load, calculating and determining the conductor, calculating and determining, determining the distribution of the R phase load, S and T and determine the capacity of the transformer. Therefore, the planning of this apartment electrical installation system must refer to the applicable rules and regulations in accordance with PUIL 2011.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | Instalasi Listrik Gedung Bertingkat, PUIL, Transformator. High-rise Building Electrical Installation, PUIL, Transformer. |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Tenaga Listrik |
| Divisions: | Vokasi > D3 Teknologi Listrik |
| Depositing User: | Sudarman |
| Date Deposited: | 20 Apr 2026 04:10 |
| Last Modified: | 20 Apr 2026 04:10 |
| URI: | https://repository.itpln.ac.id/id/eprint/6437 |
