ANALISIS DAMPAK PENURUNAN GANGGUAN KABEL SKTM 20 KV TERHADAP TINDAK LANJUT EKSEKUSI HASIL ASSESSMENT KABEL SKTM 20 KV DI PT PLN (PERSERO) UP3 MENTENG

KAHFI, ALWI and Hutajulu, Albert Gifson (2022) ANALISIS DAMPAK PENURUNAN GANGGUAN KABEL SKTM 20 KV TERHADAP TINDAK LANJUT EKSEKUSI HASIL ASSESSMENT KABEL SKTM 20 KV DI PT PLN (PERSERO) UP3 MENTENG. Diploma thesis, ITPLN.

[thumbnail of PROYEK AKHIR_ALWI KAHFI_201971152_Alwi Kahfi.pdf] Text
PROYEK AKHIR_ALWI KAHFI_201971152_Alwi Kahfi.pdf
Restricted to Registered users only

Download (2MB)

Abstract

Metode assessment merupakan kegiatan pengukuran kondisi saluran kabel tegangan menengah yang meliputi sebuah pengukuran panjang kabel, partial discharge, monitoring withstand test, cable tracer dan menganalisis hasil serta memberikan rekomendasi untuk tindakan melakukan perbaikan - perbaikan serta pemeliharaan yang diperlukan pada segmen saluran kabel tegangan menengah yang dilakukan sebuah assessment. Dalam pemberlakuan metode assessment dari tahun ketahun peningkatan mengatasi gangguan saluran kabel tegangan menengah semakin terkontrol yang mana terus dilakukannya sebuah tindak lanjut yang dilakukan untuk mencapainya penyaluran tenaga listrik berjalan dengan baik sebagaimana mestinya. Dari perhitungan yang dilakukan didapat energi yang tidak tersalurkan akibat terjadinya sebuah gangguan selama tahun 2019 terhitung sebesar 3.003.434.208 kWh. Untuk energi yang tidak disalurkan per pelanggan diperoleh sebesar 906.834 kWh/pelanggan. Rugi - rugi energi yang tidak tersalurkan jika harga listrik PLN per kWh pada tahun 2019 adalah Rp. 1,467.28/kWh. Dimana kerugian yang didapatkan akibat gangguan pada saluran kabel tegangan menengah pada tahun 2019 adalah sebesar Rp. 618,03/kWh. sebuah gangguan selama tahun 2020 terhitung sebesar 12.541.740.192 kWh. Untuk energi yang tidak disalurkan per pelanggan diperoleh sebesar 1.853.094 kWh/pelanggan. Rugi - rugi energi yang tidak tersalurkan jika harga listrik PLN per kWh pada tahun 2020 adalah Rp. 1.444,70/kWh. Dimana kerugian yang didapatkan akibat gangguan pada saluran kabel tegangan menengah pada tahun 2020 adalah sebesar Rp. 1.282,68 /kWh. Sebuah gangguan selama tahun 2021 terhitung sebesar 1.152.899.784 kWh. Untuk energi yang tidak disalurkan per pelanggan diperoleh sebesar 561.841 kWh/pelanggan. Rugi - rugi energi yang tidak tersalurkan jika harga listrik PLN per kWh pada tahun 2021 adalah Rp. 1,444.70/kWh. Dimana kerugian yang didapatkan akibat gangguan pada saluran kabel tegangan menengah pada tahun 2021 adalah sebesar Rp. 388,89 /kWh.

The assessment method is an activity to measure the condition of the medium voltage cable line which includes a measurement of cable length, partial discharge, monitoring withstand test, cable tracer and analyzing the results and providing recommendations for actions to make repairs - repairs and maintenance needed on the medium voltage cable line segment carried out an assessment. In the implementation of the assessment method from year to year, the increase in overcoming the interference of medium voltage cable lines is increasingly controlled, where a follow-up is continued to be carried out to achieve that the distribution of electric power runs well as it should. From the calculations carried out indapat the energy that was not distributed due to the occurrence of a disturbance during 2019 was calculated at 3,003,434,208 kWh. For undistributed energy per customer, it is obtained at 906,834 kWh/customer. Loss - loss of energy that is not distributed if the price of PLN electricity per kWh in 2019 is Rp. 1,467.28 / kWh. Where the loss obtained due to interference with medium voltage cable lines in 2019 was Rp. 618.03 / kWh. a disturbance during the year 2020 amounted to 12,541,740,192 kWh. For non-channeled energy per customer, it is obtained at 1,853,094 kWh/customer. Loss - loss of energy that is not distributed if the price of PLN electricity per kWh in 2020 is Rp. 1,444.70 / kWh. Where the loss obtained due to interference with medium voltage cable lines in 2020 was Rp. 1,282.68 / kWh. Thedisturbance during 2021 was 1,152,899,784 kWh. For undistributed energy per customer, it is obtained at 561,841 kWh/customer. Loss - loss of energy that is not distributed if the price of PLN electricity per kWh in 2021 is Rp. 1,444.70 / kWh. Where the loss obtained due to interference in medium voltage cable lines in 2021 is Rp. 388.89 / kWh.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Assessment, Saluran Kabel Tegangan Menengah, Energy Not Supplied Assessment, Medium Voltage Cable Line, Energy Not Supplied
Subjects: Skripsi
Bidang Keilmuan > Teknik Tenaga Listrik
Divisions: Vokasi > D3 Teknologi Listrik
Depositing User: Sudarman
Date Deposited: 20 Apr 2026 04:17
Last Modified: 20 Apr 2026 04:17
URI: https://repository.itpln.ac.id/id/eprint/6439