KOORDINASI ANTARA RECLOSER MT DAN PMT NUT PADA PENYULANG AVANZA DI ULP BOGOR TIMUR

SUGANDI, SALMA KUSUMA and Hajar, Ibnu (2022) KOORDINASI ANTARA RECLOSER MT DAN PMT NUT PADA PENYULANG AVANZA DI ULP BOGOR TIMUR. Diploma thesis, ITPLN.

[thumbnail of PROYEK AKHIR _SALMA KUSUMA SUGANDI_201971147_SALMA KUSUMA SUGANDI.pdf] Text
PROYEK AKHIR _SALMA KUSUMA SUGANDI_201971147_SALMA KUSUMA SUGANDI.pdf
Restricted to Registered users only

Download (1MB)

Abstract

Pada penelitian ini didasari karena adanya gangguan yang terjadi di penyulang AVANZA dimana sistem proteksinya gagal bekerja karena kurangnya koordinasi waktu antar alat proteksi. Tercatat bahwa penyulang AVANZA adalah penyulang dengan trip PMT GI (Zona 1) tertinggi pada tahun 2021 dengan tujuh kali trip. Setelah dilakukan identifikasi data gangguan ternyata lokasi gangguan terjadi di Zona 2 dan 3 dengan besar arus hubung dingkat yang relative kecil hingga sedang, meninjau hal tersebut seharusnya gangguan yang terjadi bisa diatasi oleh PMT dan recloser. Sehingga agar dapat terkoordinasi perlu dilakukan penghitungan waktu setting antar alat proteksi sehingga didapat selisih waktu yang sesuai dengan standar IEEE 242-2001 dimana nilai waktu kerja tiap peralatan proteksi disetting dengan kisaran selisih waktu 0,25 - 0,5 detik. Langkah pertama dalam proses pengkoordinasiannya yaitu dengan mengidentifikasi gangguan yang terjadi, kemudian melakukan perencanaan koordinasi. Setelah itu dilakukan pengumpulan data yang diperlukan dalam proses penghitungan nilai impedansi, besar arus hubung singkat dan nilai setting waktu pada recloser dan PMT, diperoleh selisih setting waktu sebesar 0,10 detik (sudah sesuai dengan standar IEEE 242-2001). Kemudian dilakukan simulasi koordinasi pada aplikasi ETAP 16.0.0 16.0.0. Setelah dilakukan simulasi, diperoleh hasil yang memuaskan yaitu selisih waktu setting sebesar 0,10 detik pada recloser dan PMT sehingga dapat terkoordinasi dengan baik, kemudian hasil inilah yang diterapkan pada setting waktu di PMT NUT dan recloser MT.

The preparation of this final project was based on a disturbance that occurred in the AVANZA feeder where the protection system failed to work due to lack of time coordination between protection devices. It is noted that the AVANZA feeder is the feeder with the highest GI PMT trip (Zone 1) in 2021 with seven trips. After identifying the fault data, it turns out that the fault location occurs in Zones 2 and 3 with a relatively small to moderate level of current, considering that the disturbance that occurs should be overcome by the PMT and recloser. So that in order to be well coordinated, it is necessary to calculate the setting time between protection devices so that the time difference is obtained according to the IEEE 242 2001 standard where the working time value of each protection device is set with a time difference of 0.25 - 0.5 seconds. The first step in the coordination process is to identify the disturbances that occur, then carry out coordination planning. After that, the data needed to be collected in the process of calculating the impedance value, the amount of short circuit current and the time setting value on the recloser and PMT, the difference in time setting is 0.10 seconds (already in accordance with the IEEE 242-2001 standard). Then a coordination simulation is performed on the ETAP 16.0.0 16.0.0 application. After the simulation, satisfactory results were obtained, namely the recloser and PMT could be coordinated well, then these results were applied to the timing settings in PMT NUT and recloser MT.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Pemutus tegangan, Recloser, Koordinasi. Breaker, Recloser, Coordinator.
Subjects: Skripsi
Bidang Keilmuan > Teknik Tenaga Listrik
Divisions: Vokasi > D3 Teknologi Listrik
Depositing User: Sudarman
Date Deposited: 20 Apr 2026 07:59
Last Modified: 20 Apr 2026 07:59
URI: https://repository.itpln.ac.id/id/eprint/6452

Actions (login required)

View Item
View Item