Semakin meningkatnya kebutuhan energi listik, sistem tenaga listrik yang disalurkan harus dipastikan dalam kondisi seandal dan seoptimal mungkin. Dalam mencapai hal tersebut, salah satu cara yang dapat dilakukan yaitu dengan peremajaan peralatan yang umurnya telah mencapai lebih dari 20 tahun. Asesmen kondisi dan pengujian pemutus tenaga pada penyulang baru gardu induk 20 kV Cipinang ini bertujuan untuk mengetahui keoptimalan serta keandalan peralatan setelah dilakukannya kegiatan peremajaan peralatan yang dilakukan pada GIS Cipinang sisi 20 kV. Berdasarkan asesmen kondisi serta pengujian peralatan pada gardu induk sisi 20 kV Cipinang, ditemukan peralatan yang usianya telah melebihi usia standar operasi peralatan yang menyebabkan keandalannya kurang optimal dan hasil dari pengecekan kondisi tersebut dibuktikan dengan hasil pengujian pada 5 buah sampel kubikel 20 kV yaitu pada penyulang basement, etalase, galery, pendopo, dan tribune. Sebagai contoh yang pertama yaitu penyulang basement yang memiliki tahanan kontak 70,8 µΩ untuk fasa R, 199,3 µΩ fasa S, dan 91,6 µΩ fasa T, arus bocor >1 µA, tahanan isolasi 1 ms. Setelah dilakukan peremajaan peralatan yaitu peremajaan cell 20 kV GI, hasil pengecekan kondisi serta pengujian peralatan membuktikan bahwa peralatan tersebut dapat bekerja dengan lebih optimal, yang dibuktikan dengan tahanan kontak 54,3 µΩ untuk fasa R, 53,3 µΩ fasa S, dan 86,7 µΩ fasa T, arus bocor 50 MΩ, serta selisih waktu buka dan tutup PMT <1 ms.
With the increasing demand for electrical energy, the distributed electric power system must be ensured in the most reliable and optimal condition possible. In achieving this, one way that can be done is by rejuvenating equipment that has reached more than 20 years of age. The condition assessment and testing of the circuit breaker at the new feeder of the 20 kV Cipinang substation aims to determine the optimization and reliability of the equipment after the equipment rejuvenation activities carried out on the 20 kV Cipinang GIS. Based on the condition assessment and testing of equipment at the 20 kV Cipinang substation, it was found that the equipment had exceeded the standard operating age of the equipment which caused its reliability to be less than optimal and the results of checking these conditions were proven by the test results on 5 samples of 20 kV cubicles, namely the basement feeder. , storefront, gallery, pavilion, and tribune. For example, the first is a basement feeder which has a contact resistance of 70.8 for the R phase, 199.3 for the S phase, and 91.6 for the T phase, leakage current >1 A, insulation resistance 1 ms. After rejuvenating the equipment, namely GI peremajaan cell 20 kVilitation, the results of checking conditions and testing equipment prove that the equipment can work more optimally, as evidenced by the contact resistance of 54.3 for the R phase, 53.3 for the S phase, and 86.7 for the T phase, leakage current 50 MΩ, and the difference between opening and closing PMT <1 ms.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | Asesmen, Kubikel, Fasa, Tahanan, Isolasi Assessment, Cubicle, Phase, Resistance, Insulation |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Tenaga Listrik |
| Divisions: | Vokasi > D3 Teknologi Listrik |
| Depositing User: | Sudarman |
| Date Deposited: | 22 Apr 2026 06:26 |
| Last Modified: | 22 Apr 2026 06:26 |
| URI: | https://repository.itpln.ac.id/id/eprint/6475 |