IMPLEMENTASI PEMELIHARAAN MINIM PADAM UNTUK MENGURANGI JUMLAH RUPIAH YANG TAK TERSELAMATKAN DI PT.PLN (PERSERO) UP3 CIPUTAT

ALIFA, SALSABILA NISA and Damiri, Dhami Johar (2022) IMPLEMENTASI PEMELIHARAAN MINIM PADAM UNTUK MENGURANGI JUMLAH RUPIAH YANG TAK TERSELAMATKAN DI PT.PLN (PERSERO) UP3 CIPUTAT. Diploma thesis, ITPLN.

[thumbnail of PROYEK AKHIR_SALSABILA NISA ALIFA_201971047_SALSABILA NISA ALIFA.pdf] Text
PROYEK AKHIR_SALSABILA NISA ALIFA_201971047_SALSABILA NISA ALIFA.pdf
Restricted to Registered users only

Download (4MB)

Abstract

Kebutuhan listrik merupakan sarana utama dalam peningkatan kesejahteraan masyarakat di era yang berkembang ini, maka penyediaan tenaga listrik harus tetap tersedia, maka dari itu dibutuhkan kegiatan pemeliharaan namun sering kali pemeliharaan pada sistem listrik khususnya di bagian distribusi harus dilakukan dengan pemadaman. Oleh karena itu diperlukan metode pemeliharaan yang dapat meminimlisir pemadaman yaitu pemeliharaan minim padam dengan menggunakan Unit Trafo Bergerak. Penelitian ini dilakukan pada beberapa gardu di Area Ciputat diantaranya Gardu CP157, CP182, CP192, dan CP340. Dari hasil penelitian menunjukkan bahwa pemeliharaan dengan metode minim padam lebih menghemat waktu dibandingkan tanpa minim padam. Dimana pemeliharaan tanpa minim padam di CP157 berdurasi 55 menit sedangkan dengan minim padam hanya 6 menit, CP182 berdurasi 90 menit sedangkan dengan minim padam hanya 9 menit, CP192 berdurasi 56 menit sedangkan dengan minim padam hanya 4 menit, dan CP340 berdurasi 53 menit sedangkan dengan minim padam hanya 6 menit. Nilai ENS pada pemelihaaraan tanpa minim padam lebih besar yaitu 419,205 kWh dengan Rp. 605.625,46 . Sedangkan ENS pada minim padam adalah 40,925 kWh dengan Rp. 59.104,23. Nilai SAIDI yang didapatkan pada tahun 2021 adalah 0,34 jam/pelanggan/tahun dan SAIFI adalah 0,26 kali/pelanggan/tahun. Menurut SPLN 59 Tahun 1985 nilai SAIDI 0,83 jam/pelanggan/tahun dan SAIFI 1,26 kali/pelanggan/tahun.

The need for electricity is the main means in improving people's welfare in this developing era, so the supply of electricity must remain available, therefore maintenance activities are needed but often maintenance on the electrical system, especially in the distribution section, must be done with blackouts. Therefore, a maintenance method that can minimize blackouts is needed, namely minimal maintenance of outages using a Mobile Transformer Unit. This research was conducted at several substations in the Ciputat Area including the CP157, CP182, CP192, and CP340 substations. The results of the study indicate that maintenance with the minimal outage method saves time more than without minimal outage. Where maintenance without minimal outages on CP157 lasted 55 minutes while with minimal outages only 6 minutes, CP182 lasted 90 minutes while with minimal outages only 9 minutes, CP192 lasted 56 minutes while with minimal outages only 4 minutes, and CP340 lasted 53 minutes while with minimal out for only 6 minutes. The value of ENS in maintenance without minimal outages is greater, namely 419,205 kWh with Rp. 605.625.46 . While the ENS at minimal outage is 40.925 kWh with Rp. 59.104.23. The SAIDI value obtained in 2021 is 0.34 hours/customer/year and SAIFI is 0.26 times/customer/year. According to SPLN 59 of 1985 the SAIDI value was 0.83 hours/customer/year and SAIFI was 1.26 times/customer/year.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Metode Minim Padam, Energy Not Served, Indeks Keandalan Minimal Outages, Energy Not Served, Reliability Index
Subjects: Skripsi
Bidang Keilmuan > Teknik Tenaga Listrik
Divisions: Vokasi > D3 Teknologi Listrik