TANJUNG, PUTRA and senen, adri (2022) STUDI KOORDINASI DAN PENYETINGAN SISTEM PROTEKSI OVER CURRENT RELAY (OCR) DAN GROUND FAULT RELAY (GFR) PADA PENYULANG KUKANG DISTRIBUSI 20 KV DI PT PLN (PERSERO) UP3 TELUK NAGA. Diploma thesis, ITPLN.
PROYEK AKHIR_PUTRA TANJUNG_201971074_PUTRA TANJUNG.pdf
Restricted to Registered users only
Download (2MB)
Abstract
Pada sistem distribusi, pemadaman yang meluas diakibatkan karena kesalahan koordinasi proteksi antara incoming feeder dan outgoing feeder, sehingga jika disalah satu penyulang mengalami gangguan maka penyulang yang lainnya juga ikut terganggu. Tetapi hal ini dapat ditekankan seminimal mungkin dengan sistem proteksi yang handal. Sistem proteksi bertujuan untuk mendeteksi terjadinya suatu gangguan dan bekerja secara selekitif untuk memilih dan memutuskan Pemutus Tenaga yang terdekat dengan titik gangguan. Pada penelitian ini, dilakukan melihat arus gangguan hubung singkat dan untuk meninjau pengaruh panjang saluran terhadap arus hubung singkat, serta menentukan setelan relai untuk mengetahui kondisi koordinasi proteksi antara gardu distribusi, incoming feeder dan outgoing feeder berdasarkan waktu kerja relai terhadap arus gangguan yang terjadi pada penyulang. Penyulang Kukang merupakan salah satu penyulang yang berada di GI Sepatan. Penyulang Kukang di suplai oleh trafo daya yang bernama trafo yang berkapasitas sebesar 60 MVA. Trafo memiliki penyulang yang salah satunya adalah penyulang Kukang. Penyulang Kukang memiliki panjang saluran sepanjang 10,962 km. Hasil perhitungan setting OCR Pada sisi outgoing arus primernya 77,28 A, TMS 0,170 s, dan waktunya 0,299 detik. Pada sisi incoming arus primernya 1818,6, TMS 0,204 s , dan waktunya 0,697 detik. Untuk hasil perhitungan setting GFR didapat bahwa nilai arus primer di sisi outgoing adalah 60,2 A, TMS 0,105 s, dan waktunya 0,299 detik. Pada sisi incoming arus primernya 1399,8, TMS 0,235, dan waktunya 0,69 detik.
The distribution system, blackout (the electrical system is die out) due to error coordination between incoming feeder protection as a back-up feeder with one of the outgoing feeders as a primary feeder. But this can be minimized with a reliable protection system. The protection system aims to detect the occurrence of a disturbance and as soon as possible isolate the part of the disturbed system so as not to affect the whole system. The research calculated short circuit current to find out the effect of network length on the short circuit current and to decide the relay setting to know the condition of coordination between distribution substasion, outgoing reeder protection and incoming feeder based on relay working time on the interference current occurred at Substation feeder. Kukang feeder is one of the feeders located at the Sepatan Substation. The Kukang feeder is supplied by a power transformer called transformer with a capacity of 60 MVA. Transformer has a feeder, one of which is a Kukang feeder. Kukang feeders have a channel length of 10,962 km.The calculation results of OCR setting value obtainedIn the outgoing side the primary current value is 77,28 A, the TMS is 0,170 s, and the time is 0,299 seconds. In the incoming side the primary current value is 1818,6 A, the TMS is 0,204 s, and the time is 0,697 seconds. The calculation results of GFR setting value obtained the primary current value in the outgoing side is 60,2 A, the TMS is 0,105 s, and the time is 0,299 seconds. In the incoming side the primary current value is 1399,8 A, the TMS is 0,235, and the time is 0,69 seconds.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | Proteksi, Gangguan Hubung Singkat, Setelan Relay, Waktu Kerja Relai Protection, Short Circuit, Relay Setting, Relay Working |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Tenaga Listrik |
| Divisions: | Vokasi > D3 Teknologi Listrik |
| Depositing User: | Sudarman |
| Date Deposited: | 23 Apr 2026 02:42 |
| Last Modified: | 23 Apr 2026 02:42 |
| URI: | https://repository.itpln.ac.id/id/eprint/6510 |