UPAYA MENURUNKAN GANGGUAN PENYULANG DENGAN CARA MEMASANG RANJAU BINATANG DI ULP LAMBARO AREA UP3 BANDA ACEH

HILMY, MUHAMMAD ICHSAN and Ispranyoto, Edy (2022) UPAYA MENURUNKAN GANGGUAN PENYULANG DENGAN CARA MEMASANG RANJAU BINATANG DI ULP LAMBARO AREA UP3 BANDA ACEH. Diploma thesis, ITPLN.

[thumbnail of PROYEK AKHIR_MUHAMMAD ICHSAN HILMY_201971035_MUHAMMAD ICHSAN HILM.pdf] Text
PROYEK AKHIR_MUHAMMAD ICHSAN HILMY_201971035_MUHAMMAD ICHSAN HILM.pdf
Restricted to Registered users only

Download (3MB)

Abstract

Dalam rangka menjaga efektifitas ketiga pilar utama PT. PLN, keandalan sistem tenaga listrik merupakan salah satu hal yang sangat diperhatikan (Persero). Gangguan pada feeder merupakan masalah yang sering muncul dalam industri distribusi. Penelitian ini bertujuan untuk mengidentifikasi akar penyebab gangguan pada penyulang pada penyulang Unit Pelayanan Pelanggan Lambaro di PT. PLN (Persero) UP3 Wilayah Kerja Banda Aceh. Gangguan pada feeder merupakan masalah umum dalam industri distribusi. Menurut temuan penelitian lapangan, hewan yang menyentuh kabel SUTM bisa menjadi sumber gangguan trip di feeder Unit Layanan Pelanggan. Persentase gangguan akibat binatang menurun dari tahun 2020 sampai 2021 dimana di tahun 2020 persentasenya 3,041% dan tahun 2021 1,90% jadi penurunannya mencapai 1,141% begitu juga dengan indeks keandalan yaitu saidi-saifi dan energi listrik KWH terselamatakannya juga menurun. Kegiatan pemeliharaan yang dilakukan terbagi pemeliharaan terpadu. Untuk meningkatkan kehandalan sistem distribusi dalam upaya menurunkan gangguan jaringan akibat binatang adalah dengan diperbanyaknya ranjau binatang supaya gangguan akibat binatangnya menurun.

In order to maintain the performance of the three main pillars of PT. PLN, one of the things that is highly concerned is the reliability of the electric power system (Persero). Interference with the feeder is the issue that frequently arises in the distribution industry. This study's goal was to identify the root cause of feeder disturbances at the Lambaro Customer Service Unit feeder in the PT. PLN (Persero) UP3 Banda Aceh work area. Feeder interference is a common issue in the distribution industry. According to field research findings, an animal that touched the SUTM cable could be the source of trip disturbances in the Customer Service Unit feeder. The percentage of animal disturbance decreased from 2020 to 2021; it was 3,041% in 2020 and 1,90% in 2021, for a decrease of 1,141%. The reliability index, or saidi-saifi, and the amount of electrical energy saved also decreased. Integrated maintenance is a division of the maintenance tasks performed. Animal mines must be multiplied in order to strengthen the distribution system's dependability in an effort to limit the number of network interruptions brought on by animals.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Kehandalan Sistem, Persentase Gangguan, Saidi-Saifi, KWH Terselamatkan System Reliability, Fault Percentage, Saidi-Saifi, KWH Saved
Subjects: Skripsi
Bidang Keilmuan > Teknik Tenaga Listrik
Divisions: Vokasi > D3 Teknologi Listrik
Depositing User: Sudarman
Date Deposited: 24 Apr 2026 04:39
Last Modified: 24 Apr 2026 04:39
URI: https://repository.itpln.ac.id/id/eprint/6522

Actions (login required)

View Item
View Item