RAMADHANA, MUHAMMAD HANAN and Diantari, Retno Aita (2022) KAJIAN PARTIAL DISCHARGE PADA GENERATOR BLOK 3.1 DI PLTGU PRIOK POMU. Diploma thesis, ITPLN.
Proyek Akhir_Muhammad Hanan Ramadhana_2019710_MUHAMMAD HANAN RAMAD.pdf
Restricted to Registered users only
Download (2MB)
Abstract
Generator digunakan pada pembangkit listrik, salah satunya pada Pembangkit Listrik Tenaga Gas Uap (PLTGU). PLTGU merupakan pembangkit yang didalamnya terdapat dua jenis pembangkit dengan penggerak utama (prime mover) yang berbeda, yaitu dengan menggunakan pembakaran gas alam atau disebut pembangkit listrik tenaga gas (PLTG) dan menggunakan uap atau disebut juga dengan (PLTGU). Generator perlu dilakukan pemeliharaan untuk mengatisipasi atau mencegah kerusakan isolasi atau ganguan yang disebabkan oleh partial discharge (PD). Kerusakan isolasi atau gangguan akibat adanya partial discharge sering terjadi pada generator, untuk itu pada penelitian ini bertujuan untuk menganalisa partial discharge generator blok 3.1 di PLTGU Priok POMU dengan menggunakan metode Phase Resolved Partial Discharge (PRPD) dan menganalisa resiko PD sesuai dengan standar PD Tech Power Engineering Agency. Analisa PD generator dilakukan sebelum dan sesudah pemeliharaan, dimana berdasarkan hasil pengukuran PD di dapatkan hasil PD sebelum pemeliharaan memiliki nilai tertinggi pada fasa R yang bernilai 0,926 nC, dan pada PD sesudah pemeliharaan memiliki nilai PD tertinggi pada fasa R yaitu sebesar 0,887 nC. PD sebelum dan sesudah pemeliharaan berdasarkan metode PRPD dikategorikan S4 (Micro Void) yang beresiko rendah, serta berdasarkan standar PD Tech Power Engineering Agency dikategorikan PD rendah.
Generators are used in power plants, one of which is at the Steam Gas Power Plant (PLTGU). PLTGU is a plant in which there are two types of plants with different prime movers, namely by using natural gas combustion or called gas power plants (PLTG) and using steam or also known as (PLTGU). Generators need to be maintained to anticipate or prevent insulation damage or disturbance caused by partial discharge (PD). Insulation damage or interference due to partial discharge often occurs in the generator, for this reason, this study aims to analyze the partial discharge generator block 3.1 at the Priok POMU PLTGU using Phase Resolved Partial Discharge (PRPD) method and analyze PD risk in accordance with PD Tech Power Engineering Agency standards. Pd generator analysis is carried out before and after maintenance, where based on the results of PD measurements obtained pd results before maintenance have the highest value in phase R which is valued at 0.926 nC, and in PD after maintenance has the highest PD value in phase R which is 0.887 nC. Pd before and after maintenance based on the PRPD method is categorized as S4 (Micro Void) which is low risk, and based on PD Tech Power Engineering Agency standards is categorized as low PD.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | Generator, Partial discharge, Pemeliharaan, Isolasi, PLTGU Generator, Partial discharge, Maintenance, Isolation, PLTGU |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Tenaga Listrik |
| Divisions: | Vokasi > D3 Teknologi Listrik |
| Depositing User: | Sudarman |
| Date Deposited: | 24 Apr 2026 04:48 |
| Last Modified: | 24 Apr 2026 04:48 |
| URI: | https://repository.itpln.ac.id/id/eprint/6523 |
