DURITA, MARLI and Diantari, Retno Aita (2022) IMPLEMENTASI SCADA DALAM WAKTU PEMULIHAN GANGGUAN TERHADAP ENERGI TAK TERSUPLAI DI GI KEMBANGAN, GI GAMBIR BARU, DAN GI CAWANG LAMA. Diploma thesis, ITPLN.
PROYEK AKHIR_MARLI DURITA_201971064_MARLI DURITA.pdf
Restricted to Registered users only
Download (4MB)
Abstract
SCADA (Supervisory Control and Data Acquisition) merupakan suatu sistem yang banyak digunakan di industri sebagai pengontrol dan pengatur dari proses-proses industri. Belakangan ini sistem SCADA banyak diaplikasikan pada penyaluran distribusi listrik. Adanya sistem SCADA pada kopel dapat mempermudah pengecekan status pada circuit breaker bagi operator di gardu induk dan juga berfungsi dapat mengefisienkan waktu untuk mengendalikan dan memulihkan jaringan listrik, dapat memperkecil area pemadaman, dan juga dapat meningkatkan pelayanan dalam menyalurkan tenaga listrik ke konsumen. Pada gardu induk Gambir Baru sebelum dilakukan pemasangan fasilitas SCADA nilai energi tak tersuplai sebesar 89.721 kWh. Setelah dilakukan pemasangan fasilitas SCADA mengalami penurunan menjadi sebesar 982 kWh. Pada gardu induk Kembangan sebelum dilakukan pemasangan fasilitas SCADA nilai energi tak tersuplai sebesar 7.832 kWh. Setelah dilakukan pemasangan fasilitas SCADA mengalami penurunan menjadi sebesar 2.895 kWh. Pada gardu induk Cawang Lama sebelum dilakukan pemasangan fasilitas SCADA nilai energi tak tersuplai sebesar 46.796 kWh. Setelah dilakukan pemasangan fasilitas SCADA mengalami penurunan menjadi sebesar 979 kWh.
SCADA (Supervisory Control and Data Acquisition) is a system widely used in industry as a controller and regulator of industrial processes. Recently, the SCADA system has been widely applied to the distribution of electricity distribution. The existence of the SCADA system on the coupling can make it easier to check the status of the circuit breaker for operators at substations and also function to streamline the time to control and restore the power grid, can reduce the area of outages, and can also improve services in distributing electricity to consumers. At the Gambir Baru substation before the installation of the SCADA facility, the unsupervised energy value was 89,721 kWh. After the installation of the SCADA facility, it decreased to 982 kWh. At the Kembangan substation before the installation of the SCADA facility, the unsupervised energy value was 7,832 kWh. After the installation of the SCADA facility, it decreased to 2,895 kWh. At the Cawang Lama substation before the installation of the SCADA facility, the unsupervised energy value was 46,796 kWh. After the installation of the SCADA facility, it decreased to 979 kWh.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | SCADA, Gardu induk, Energi tak tersuplai. SCADA, Substation, Energy Not Supplied |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Tenaga Listrik |
| Divisions: | Vokasi > D3 Teknologi Listrik |
| Depositing User: | Sudarman |
| Date Deposited: | 24 Apr 2026 05:27 |
| Last Modified: | 24 Apr 2026 05:27 |
| URI: | https://repository.itpln.ac.id/id/eprint/6529 |
