Tuasikal, Zikrudin and Suyanto, Heri (2025) PEMODELAN SISTEM HYBRID (PLTS DAN PLTMH) UNTUK PENYEDIAAN LISTRIK BERKELANJUTAN DI KEPULAUAN NIAS. Diploma thesis, Institut Teknologi PLN.
SKRIPSI 202111005 ZIKRUDIN TUASIKAL.pdf
Restricted to Registered users only
Download (1MB)
Abstract
The Nias Islands still face electricity shortages, particularly in remote areas that are not yet fully connected to the PLN grid, despite having significant potential for solar and micro-hydro energy. This study aims to design a hybrid power generation system combining Solar Power Plants (PLTS) and Micro-Hydro Power Plants (PLTMH) to support sustainable energy supply. The research employed a quantitative approach through simulations using HOMER Pro software, utilizing solar radiation data, river discharge, and community electricity load profiles. The simulation results indicate an optimal configuration with a 6 MW PLTS and a 1 MW PLTMH, capable of producing 7,326,788 kWh of electricity per year. From an economic perspective, Scenario I (with PLTD) yields a Net Present Cost (NPC) of Rp457.28 billion and a Levelized Cost of Energy (LCOE) of Rp40,620.39/kWh, whereas Scenario II (without PLTD) results in an NPC of Rp150.23 billion and an LCOE of Rp13,345.11/kWh. These findings confirm that Scenario II is more efficient, cost-effective, and environmentally friendly, with a renewable energy penetration of 100%.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | Hybrid System, Solar Power Plant, Microhydro Power Plant, HOMER Pro, Renewable Energy. |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Elektro Tenaga Listrik |
| Divisions: | Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro |
| Depositing User: | Sutrisno |
| Date Deposited: | 29 Apr 2026 01:54 |
| Last Modified: | 29 Apr 2026 01:54 |
| URI: | https://repository.itpln.ac.id/id/eprint/6591 |