PERHITUNGAN EFISIENSI BOILER CFB MENGGUNAKAN METODE OUTPUT-INPUT DI UNIT 3 PLTU JERANJANG, LOMBOK

Rasworo, Panji and sahlan, sahlan (2018) PERHITUNGAN EFISIENSI BOILER CFB MENGGUNAKAN METODE OUTPUT-INPUT DI UNIT 3 PLTU JERANJANG, LOMBOK. Diploma thesis, ITPLN.

[thumbnail of PROYEK AKHIR Panji Rasworo.pdf] Text
PROYEK AKHIR Panji Rasworo.pdf
Restricted to Registered users only

Download (3MB)

Abstract

Pembangkit Listrik Tenaga Uap (PLTU) merupakan pembangkit listrik yang mengubah energi kimia dalam bahan bakar menjadi energi panas (uap), lalu energi panas (uap) digunakan untuk memutar turbin uap yang satu poros dengan generator sehingga menghasilkan listrik. PLTU Jeranjang Lombok memiliki komponen utama salah satunya adalah Boiler CFB yang merupakan boiler yang menggunakan Prinsip mensirkulasikan batubara yang belum kebakar didalam furnance. Boiler berfungsi mengubah air menjadi uap panas lanjut digunakan untuk memutar turbin. Oleh karena itu perlu dilakukan perhitungan efisiensi Boiler CFB dengan metode Output-input yang mengacu standar ASME untuk mengetahui efisiensi Boiler CFB secara cepat yang terjadi pada beban komisioning 30 MW dan Operasi 25 MW dan selanjutnya dibandingkan. Berdasarkan kesimpulan efisiensi Boiler CFB menggunakan metode output-input pada beban komisioning 30 MW sebesar 87% sedangkan Operasi 25 MW sebesar 77,58% jadi selisih perbedaan sebesar 9,42% atau setara 0,195.

Steam Power Plant (PLTU) is a power plant that converts chemical energy into fuel into heat energy (steam), and heat energy (steam) is used to rotate a steam turbine with a generator to generate electricity. PLTU Jeranjang Lombok has the main components one of which is Boiler CFB which is a boiler that uses Principles circulating coal that has not been burning inside the furnace. The boiler serves to convert water to an advanced hot vapor used to rotate the turbine. Therefore it is necessary to calculate the efficiency of CFB Boiler with the method of Outputs which refers to ASME standard to know the efficiency of CFB Boiler rapidly which happened at commissioning load 30 MW and Operation 25 MW and then compared. Based on the conclusions of CFB Boiler efficiency using the input-output method at 30 MW commissioning load of 87% while Operation 25 MW of 77.58% so difference difference of 9.42% or equivalent 0.195.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Boiler CFB, Perhitungan, efisiensi, Metode Output-Input CFB Boiler, Calculation, efficiency, Output-Input Method
Subjects: Skripsi
Bidang Keilmuan > Teknik Mesin
Divisions: Vokasi > D3 Teknik Mesin
Depositing User: Sudarman
Date Deposited: 14 May 2026 07:28
Last Modified: 14 May 2026 07:28
URI: https://repository.itpln.ac.id/id/eprint/6743