Nafis, Muhammad and Hastanto, Hastanto (2021) ANALISIS KAPASITAS DAN KINERJA RUAS JALAN PAHLAWAN AKIBAT PEMBANGUNAN PROYEK DOUBLE TRACK BOGOR-SUKABUMI. Diploma thesis, ITPLN.
Andifa, Rizki and Hastanto, Hastanto (2021) ANALISIS PERBANDINGAN BIAYA DAN WAKTU PEKERJAAN STRUKTUR PELAT LANTAI DENGAN METODE KONVENSIONAL DAN HALF SLAB (STUDI KASUS: PROYEK PEMBANGUNAN APARTEMEN TOKYO RIVERSIDE TOWER 7 - PIK 2, TANGERANG). Diploma thesis, ITPLN.
Anggunati, Anggunati and Hastanto, Hastanto (2021) ANALISIS PERBANDINGAN BIAYA DAN WAKTU PEKERJAAN TANGGA PRECAST DENGAN KONVENSIONAL (STUDI KASUS : PROYEK PEMBANGUNAN TOKYO RIVERSIDE APARTMENT – PIK 2). Diploma thesis, ITPLN.
SIPAYUNG, T. ENJEL. E. and Hastanto, Hastanto (2021) ANALISIS PERBANDINGAN BIAYA MUTU WAKTU PEMBESIAN DENGAN MENGGUNAKAN COUPLER DAN DENGAN MENGGUNAKAN BENDRAT PADA PEKERJAAN PIERHEAD. Diploma thesis, ITPLN.
Seknun, Hafifah Faqih and Hastanto, Hastanto (2021) ANALISIS PRODUKTIVITAS DAN BIAYA TENAGA KERJA PADA PEKERJAAN KOLOM (Studi Kasus : Proyek Pembangunan Infrastruktur Laboratorium Gedung Genomic Paket 2 Cibinong Bogor). Diploma thesis, ITPLN.
Berlian, Nancy and Hastanto, Hastanto (2021) OPTIMASI BIAYA DAN WAKTU PENYELESAIAN PROYEK DENGAN METODE TIME COST TRADE OFF PADA PROYEK PEMBANGUNAN GARDU INDUK 150 KV SEKOTONG. Diploma thesis, ITPLN.
Nugraha, Fida Adiguna and Hastanto, Hastanto (2021) ANALISIS PRODUKTIVITAS DAN BIAYA OPERASIONAL TOWER CRANE UNTUK PEKERJAAN STRUKTUR PADA PROYEK PEMBANGUNAN APARTEMEN SKY HOUSE ALAM SUTERA. Diploma thesis, ITPLN.
Oktaviani, Putri and Hastanto, Hastanto (2021) ANALISIS RISIKO K3 PADA PELAKSANAAN PROYEK PEMBANGUNAN INFRASTRUKTUR LABORATORIUM GEDUNG GENOMIC PAKET 2 CIBINONG BOGOR. Diploma thesis, ITPLN.
Saputra, Ariangga and Hastanto, Hastanto (2021) ANALISIS RISIKO KONSTRUKSI PADA PEKERJAAN PENGECORAN PELAT LANTAI DITINJAU DARI PROSES PEKERJAAN BETON PADA PROYEK APARTEMENT 57 PROMENADE JAKARTA PUSAT. Diploma thesis, ITPLN.
Killana S, Endangsah and Hastanto, Hastanto (2019) OPTIMALISASI PELAKSANAAN PROYEK KONSTRUKSI DENGAN METODE PERT (STUDI KASUS : DOWNSTREAM REGULATING DAM PLTA JATIGEDE SUMEDANG). Diploma thesis, ITPLN.
Salsabila, Ghina and Hastanto, Hastanto (2019) ANALISIS FAKTOR-FAKTOR RISIKO PADA PROYEK PEMBANGUNAN GEDUNG APARTEMEN EVENCIIO MARGONDA YANG BERPENGARUH TERHADAP KINERJA WAKTU. Diploma thesis, ITPLN.
Lubis, Klaudius Wirawan and Hastanto, Hastanto (2019) ANALISIS PENERAPAN SISTEM MANAJEMEN MUTU BERBASIS ISO 9001:2015 TERHADAP KINERJA KONTRAKTOR PADA PROYEK PEMBANGUNAN RUNWAY 3 SECTION 1 BANDARA SOEKARNO – HATTA. Diploma thesis, ITPLN.
Ilmawan, Bagas Dihar and Hastanto, Hastanto (2019) ANALISIS FAKTOR – FAKTOR YANG MEMPENGARUHI PRODUKTIVITAS PADA PROYEK KONSTRUKSI (STUDI KASUS : JEMBATAN PENYEBERANGAN MULTIGUNA TANAH ABANG “SKYBRIDGE”). Diploma thesis, ITPLN.
Saputri, Anatasya Wahyu and Hastanto, Hastanto (2019) Analisis Alternatif Metode Pelaksanaan Untuk Mengatasi Keterlambatan Proyek Dengan Resiko Terkecil (Studi Kasus : Proyek Apartemen Prosperity Residence The Lotus, Kembangan, Jakarta Barat). Diploma thesis, ITPLN.
Aryawan, Moehammad Habibil and Hastanto, Hastanto (2019) Analisis What If Sebagai Metode Antisipasi Keterlambatan Pada Proyek Runway 3 Section 1 Bandar Udara Internasional Soekarno-Hatta, Tangerang, Banten. Diploma thesis, ITPLN.
Syasmita, Elsa and Hastanto, Hastanto (2019) Analisa Pengaruh Contract Change Order (CCO) Terhadap Pelaksanaan Proyek Konstruksi PLTA Jatigede Sumedang. Diploma thesis, ITPLN.
NAPITU, FRANZ TRYWANDI SARAGI and Hastanto, Hastanto (2019) PRODUKTIVITAS ALAT BERAT HYDRAULIC PILE HAMMER PADA PROYEK PEMBANGUNAN PLTGU MUARA KARANG 400-500 MW. Diploma thesis, ITPLN.
Zaharah, Raissa Waris and Hastanto, Hastanto (2019) ANALISIS PERBANDINGAN NILAI HASIL TERHADAP BIAYA DAN WAKTU DENGAN REALISASI PEKERJAAN (STUDI KASUS PEKERJAAN TAHAP 4 PADA PROYEK PEMBANGUNAN MARKAS KOMANDO LANTAMAL XII, PONTIANAK, KALIMANTAN BARAT). Diploma thesis, ITPLN.
PRASETYO, MEYDI RIZAL RURI and Hastanto, Hastanto (2019) PERBANDINGAN PRODUKTIVITAS SERTA BIAYA PENGGUNAAN HYDRAULIC STATIC PILE DRIVER DAN DIESEL HAMMER PILE (STUDI KASUS : PROYEK JALAN TOL JORR II RUAS KUNCIRAN - SERPONG PAKET 1 KUNCIRAN – PARIGI). Diploma thesis, ITPLN.
Panjaitan, Hapizin Yonani and Hastanto, Hastanto (2018) Perencanaan Wesel dan Perbaikan Geometri Jalan Rel Jalur Sudirman – Manggarai dan Jalur Badug Tenggulun Untuk Pemasangan Wesel Cross Over. Diploma thesis, ITPLN.
Riyani, Fitri and Hastanto, Hastanto (2018) EFISIENSI TOWER CRANE TERHADAP WAKTU DAN BIAYA PELAKSANAAN STRUKTUR PADA PROYEK GEDUNG SOCIAL SECURITY TOWER, KUNINGAN, JAKARTA SELATAN. Diploma thesis, ITPLN.
Purwanda, Nur Widia and Hastanto, Hastanto (2018) ANALISIS FAKTOR CONSTRUCTION WASTE TIME DENGAN METODE VALUE STREAM MAPPING PADA PEKERJAAN KOLOM DAN SHEARWALL GEDUNG BERTINGKAT (Studi Kasus : Proyek Apartemen Alexandria Tower, Silk Town, Serpong Utara, Tangerang Selatan). Diploma thesis, ITPLN.
Yusuf, Zulfiani and Hastanto, Hastanto (2018) ANALISIS PENERAPAN MANAJEMEN MUTU TERHADAP HASIL PENGECORAN BETON PADA PROYEK APARTEMEN DAAN MOGOT CITY. Diploma thesis, ITPLN.
Swandayani, YahyaNur Fitriyah and Hastanto, Hastanto (2018) ANALISA SISA MATERIAL PT. SATYAMITRA SURYA PERKASA (SSP) DENGAN MENGGUNAKAN METODE PARETO PADA PROYEK PEMBANGUNAN PLTU JAWA TENGAH KAPASITAS (2X1000) MW. Diploma thesis, ITPLN.
Yulianto, Gilang and Hastanto, Hastanto (2017) PERBANDINGAN BIAYA DAN DURASI PELAKSANAAN PEKERJAAN BEKISTING MULTIPLEKS DAN BATAKO PADA PEKERJAAN PILE CAP PROYEK DOUBLE – DOUBLE TRACK STASIUN MANGGARAI. Diploma thesis, ITPLN.
WATI, IDA AYU GEDE DITA PRADNYA and Hastanto, Hastanto (2017) MANAJEMEN MATERIAL TERKAIT EFISIENSI TOWER CRANE TERHADAP WAKTU PELAKSANAAN PROYEK (STUDY KASUS: PROYEK APARTMENT VITTORIA RESIDENCE). Diploma thesis, ITPLN.