Items where Author is "Kustanrika, Irma Wirantina"
Febrian, Muhammad Vitho and Kustanrika, Irma Wirantina (2024) ANALISIS PERBANDINGAN BEKISTING KONVENSIONAL DAN BEKISTING BAJA DITINJAU DARI ASPEK BIAYA DAN WAKTU PADA PEKERJAAN STRUKTUR OFFICE TOWER – PIK 2. Diploma thesis, ITPLN.
Sajidah, Tiyastini Alfi and Kustanrika, Irma Wirantina (2024) ANALISIS DAMPAK CHANGE ORDER TERHADAP WAKTU PADA PROYEK KONSTRUKSI SKY HOUSE ALAM SUTRA + PHASE 2. Diploma thesis, ITPLN.
Nasrullah H, Muh Asmar and Kustanrika, Irma Wirantina (2024) ANALISIS PRODUKTIVITAS PEKERJA DENGAN MENGGUNAKAN METODE TIME STUDY PADA PEKERJAAN BALOK DAN KOLOM LANTAI 12 PROYEK PEMBANGUNAN STRUKTUR OFFICE TOWER PIK2. Diploma thesis, ITPLN.
Aziz, Afifuddin and Kustanrika, Irma Wirantina (2024) ANALISIS PERCEPATAN PROYEK DENGAN METODE TIME COST TRADE-OFF PADA PEMBANGUNAN PEKERJAAN SUTT 150 KV GEDONG TATAAN – TELUK RATAI. Diploma thesis, ITPLN.
Saifudin, Hasyim and Kustanrika, Irma Wirantina (2024) ANALISIS PERCEPATAN PROYEK DENGAN METODE TIME COST TRADE-OFF PADA PEKERJAAN PEMBANGUNAN SUTT 150 KV TALISAYAN-MALOY. Diploma thesis, ITPLN.
KOROMAT, ERNESTO S. and Kustanrika, Irma Wirantina (2024) EVALUASI PERBANDINGAN PERHITUNGAN RENCANA ANGGARAN BIAYA (RAB) DENGAN ANGGARAN PELAKSANAAN (RAP) BERDASARKAN METODE ANALISIS HARGA SATUAN (AHS). Diploma thesis, ITPLN.
NAINGGOLAN, ROPATAR and Kustanrika, Irma Wirantina (2024) ANALISIS PRODUKTIVITAS TENAGA KERJA PADA PEKERJAAN KOLOM BAJA DAN BALOK BAJA DENGAN METODE WORK SAMPLING PROYEK GEDUNG NUSANTARA 1 MPR/DPR SENAYAN. Diploma thesis, ITPLN.
Napitupulu, Mikha Rosmedi and Kustanrika, Irma Wirantina (2024) EVALUASI PENJADWALAN ULANG PROYEK KONSTRUKSI DENGAN METODE CRITICAL CHAIN PROJECT MANAGEMENT (CCPM) (STUDI KASUS : PEMBANGUNAN GEDUNG OFFICE SIDO MUNCUL CIPETE). Diploma thesis, ITPLN.
Tantra, Diandri Retno Diva and Kustanrika, Irma Wirantina (2024) ANALISIS FAKTOR RISIKO KECELAKAAN KERJA PEKERJAAN PIER HEAD PADA PROYEK PEMBANGUNAN JALAN TOL SERPONG – BALARAJA SEKSI 1B. Diploma thesis, ITPLN.
Lestari, Andi Dwi Ayu and Kustanrika, Irma Wirantina (2023) ANALISIS PERBANDINGAN PELAT LANTAI KONVENSIONAL DAN HALF SLAB PRECAST DITINJAU DARI ASPEK BIAYA DAN WAKTU PADA PROYEK PEMBANGUNAN GEDUNG OFFICE PROKLAMASI 46 JAKARTA. Diploma thesis, ITPLN.
Budiman, Alya Fieryal and Kustanrika, Irma Wirantina (2022) ANALISIS PENYEBAB DAN AKIBAT VARIATION ORDER TERHADAP BIAYA PADA PROYEK EXTENTION COLD STORAGE BUILDING SUKANDA DJAYA MM2100. Diploma thesis, ITPLN.
Julian, Bintang Putra and Kustanrika, Irma Wirantina (2021) PENERAPAN SOFT SYSTEM METHODOLOGY TERHADAP ALUR PENDISTRIBUSIAN MATERIAL BAJA TULANGAN UNTUK MENINGKATKAN EFISIENSI WAKTU PELAKSANAAN KONSTRUKSI (Studi Kasus: Proyek North Point Navapark, Tangerang). Diploma thesis, ITPLN.
Deswandi, Yoga Perdana and Kustanrika, Irma Wirantina (2021) ANALISIS EFEKTIFITAS PEKERJA PADA PEKERJAAN PENGECORAN RAFT FOUNDATION DENGAN METODE WORK SAMPLING DIPROYEK APARTMENT TOKYO RIVERSIDE TOWER 8 ZONA 4 - PIK 2 TANGERANG, BANTEN. Diploma thesis, ITPLN.
Ikram, Carona Bayu and Kustanrika, Irma Wirantina (2021) ANALISIS PERCEPATAN WAKTU PENYELESAIAN PROYEK DAN OPTIMASI BIAYA DENGAN METODE TIME COST TRADE OFF (Studi Kasus : Proyek Pembangunan Rusunami Dp 0 Rupiah Nuansa Cilangkap, Jakarta Timur). Diploma thesis, ITPLN.
Ikhsan, Putra Muhamad and Kustanrika, Irma Wirantina (2021) ANALISIS FAKTOR RISIKO KETERLAMBATAN WAKTU PADA PROYEK LANJUTAN PEKERJAAN AKSESIBILITAS BANDARA SOEKARNO-HATTA. Diploma thesis, ITPLN.
Puspitasari, Dia Ayu and Kustanrika, Irma Wirantina (2021) ANALISIS PENERAPAN LEVEL RISIKO KESELAMATAN DAN KESEHATAN KERJA PADA PROYEK JALUR KERETA API BANDARA YOGYAKARTA INTERNATIONAL AIRPORT. Diploma thesis, ITPLN.
Sibuea, Tama and Kustanrika, Irma Wirantina (2021) PENERAPAN STANDAR KESELAMATAN DAN KESEHATAN KERJA (K3) PADA PROYEK PEMBANGUNAN GEDUNG LABORATORIUM GENOMIC LIPI CIBINONG. Diploma thesis, ITPLN.
Ramzi, Dicky Septia and Kustanrika, Irma Wirantina (2019) ANALISIS KEBUTUHAN TULANGAN MENGGUNAKAN LINIER PROGRAMING DENGAN MEMPERHITUNGKAN OPTIMASI WASTE MATERIAL BESI TULANGAN PADA PEKERJAAN BALOK, PROYEK PEMBANGUNAN APARTEMEN SOUTHGATE, TANJUNG BARAT, JAKARTA SELATAN. Diploma thesis, ITPLN.
Putra, Idit Mona and Kustanrika, Irma Wirantina (2018) ANALISIS TIME COST TRADE OFF UNTUK PENGOPTIMALAN WAKTU DENGAN PERTIMBANGAN BIAYA PEKERJAAN SHEARWALL DAN KOLOM PADA PROYEK PEMBANGUNAN APARTEMEN GREEN SEDAYU GROUP (Studi Kasus : Proyek Apartemen Green Sedayu Group, Taman Palem Lestari, Cengkareng, Jakarta Barat). Diploma thesis, ITPLN.
Zaman, Fakhruz and Kustanrika, Irma Wirantina (2018) ANALISIS PERBANDINGAN BIAYA PELAKSANAAN PEKERJAAN BEKISTING MULTIPLEKS DENGAN FIBERGLASS UNTUK PEKERJAAN PIER HEAD PADA PROYEK DOUBLE - DOUBLE TRACK, MANGGARAI - JATINEGARA. Diploma thesis, ITPLN.
Toruan, Christopel Lumban and Kustanrika, Irma Wirantina (2017) PEMANFAATAN PENGGUNAAN TEPUNG CANGKANG TELUR DAN BAN BEKAS PADA CAMPURAN BETON. Diploma thesis, ITPLN.