Items where Author is "Putri, Pratiwi Setyaning"
Thesis
Putra, Raehan Pratama and Putri, Pratiwi Setyaning (2024) ANALISIS PRODUKTIVITAS PEMAKAIAN ALAT BERAT TERHADAP BIAYA DAN WAKTU MENGGUNAKAN PANDUAN SNI PADA PEKERJAAN FLEXIBLE PAVEMENT. Diploma thesis, ITPLN.
Reza, Muhammad and Putri, Pratiwi Setyaning (2024) ANALISIS PRODUKTIVITAS TENAGA KERJA PADA PEKERJAAN PEMBANGUNAN COOLING WATER PUMP HOUSE DENGAN PENDEKATAN METHOD PRODUCTIVITY DELAY MODEL (MPDM) PADA PROYEK JAWA 9 & 10 (2 X 1000 MW) PLTU SURALAYA. Diploma thesis, ITPLN.
Septian, Muhammad Farhan and Putri, Pratiwi Setyaning (2024) ANALISIS PENGENDALIAN MANAJEMEN MUTU PEKERJAAN KOLOM DAN BALOK PADA PROYEK PEMBANGUNAN OFFICE DM-58. Diploma thesis, ITPLN.
Pratama, Windu Adi Vida and Putri, Pratiwi Setyaning (2024) ANALISIS KETERKAITAN LABOUR UTILIZATION RATE (LUR) TERHADAP PRODUKTIVITAS TENAGA KERJA PEKERJAAN PILE CAP PADA PROYEK JALAN TOL JAKARTA – CIKAMPEK II SELATAN. Diploma thesis, ITPLN.
Arilia, Sabilla Vinka and Putri, Pratiwi Setyaning (2024) PENGENDALIAN WAKTU PROYEK DENGAN METODE CRITICAL CHAIN PROJECT MANAGEMENT (CCPM) UNTUK MENCEGAH KETERLAMBATAN PADA PROYEK JALAN TOL. Diploma thesis, ITPLN.
HANAFI, HANAFI and Putri, Pratiwi Setyaning (2024) PENGENDALIANWAKTUPELAKSANAANPROYEK DENGANMENGGUNAKANMETODEFAST TRACKUNTUK MENCEGAH KETERLAMBATAN (CASEPROYEKGARDU INDUK150KVBINTUHANDANEXTENSION2LBGI150 KVMANNA). Diploma thesis, ITPLN.
Kalesara, Oka and Putri, Pratiwi Setyaning (2024) ANALISIS PENGENDALIAN BIAYA DAN WAKTU MENGGUNAKAN METODE EARNED VALUE PADA PROYEK PEMBANGUNAN GI 150KV TARJUN. Diploma thesis, ITPLN.
Hafidh, Alfan and Putri, Pratiwi Setyaning (2024) PENGENDALIAN WAKTU PENYELESAIAN PROYEK DENGAN METODE CRASHING UNTUK PERCEPATAN PENYELESAIAN PEKERJAAN SALURAN UDARA TEGANGAN TINGGI 150 KV XYZ – PT GHI. Diploma thesis, ITPLN.
Wahyuni, Sri and Putri, Pratiwi Setyaning (2024) ANALISIS PENJADWALAN WAKTU PROYEK DENGAN MENGGUNAKAN METODE LOB (LINE OF BALANCE) PADA PROJECT KANTOR PT OMETRACO ARYA SAMANTA. Diploma thesis, ITPLN.
Reyfasha, M Fadhiel and Putri, Pratiwi Setyaning (2024) ANALISIS MANAJEMEN RISIKO KECELAKAAN KERJA MENGGUNAKAN METODE HIRADC PADA PEKERJA DI PROYEK LUXURY RESIDENCE SAVYAVASA PT. TAISEI-CSEC TAHUN 2023. Diploma thesis, ITPLN.
Siregar, Hafizah Khairani and Putri, Pratiwi Setyaning (2024) ANALISIS PENERAPAN LEAN CONSTRUCTION BERBASIS RISIKO UNTUK MEMINIMALISIR WASTE (STUDI KASUS : PROYEK LUXURY RESIDENCE SAVYAVASA – DARMAWANGSA). Diploma thesis, ITPLN.
Monim, Ray Winfield Jansen and Putri, Pratiwi Setyaning (2022) ANALISA PERBANDINGAN DURASI WAKTU PROYEK KONSTRUKSI DENGAN METODE CPM DAN METODE CCPM (STUDI KASUS: PROYEK PEMBANGUNAN RESERVOIR DI SKYLAND KOTA JAYAPURA). Diploma thesis, ITPLN.
Dasriani, Shily Fayha and Putri, Pratiwi Setyaning (2022) ANALISIS FAKTOR RISIKO PEKERJAAN BOX GIRDER CAST IN SITU TERHADAP KINERJA WAKTU PADA PROYEK DOUBLE – DOUBLE TRACK MANGGARAI S.D. JATINEGARA. Diploma thesis, ITPLN.
Beroperai, Klarita and Putri, Pratiwi Setyaning (2022) ANALISIS PERBANDINGAN WAKTU DAN BIAYA PELAKSANAAN PEKERJAAN ANTARA PELAT BONDEK DENGAN KONVENSIONAL (STUDI KASUS PROYEK PEMBANGUNAN GEDUNG PENYIMPANAN BENDA SITAAN DAN BARANG RAMPASAN KOMISI PEMBERANTASAN KORUPSI, CAWANG TAHUN 2021). Diploma thesis, ITPLN.
Ghifari, Haudhil and Putri, Pratiwi Setyaning (2022) ANALISIS PENGARUH PENERAPAN PERATURAN KESELAMATAN DAN KESEHATAN KERJA (K3) BERBASIS MANAJEMEN RISIKO PADA PROYEK PEMBANGUNAN GUDANG PLTU BANTEN 3 LONTAR OMU. Diploma thesis, ITPLN.
Putra, Doni Azhadi and Putri, Pratiwi Setyaning (2022) ANALISA FAKTOR PENGARUH PRODUKTIVITAS TENAGA KERJA TERHADAP KINERJA WAKTU PADA PEKERJAAN PEMBESIAN SLAB (STUDI KASUS : DEPO LRT JABODEBEK). Diploma thesis, ITPLN.
Aisya, Tania Nur and Putri, Pratiwi Setyaning (2021) ANALISIS FAKTOR PENYEBAB KETERLAMBATAN BERBASIS MANAJEMEN RISIKO PADA PELAKSANAANPROYEK RUSUNAMI DP 0 RUPIAH TOWER-A NUANSA CILANGKAP, JAKARTA TIMUR. Diploma thesis, ITPLN.
Syaldi, Muh and Putri, Pratiwi Setyaning (2021) ANALISA PENGGUNAAN JALAN KERJA MENGGUNAKAN ARAMCO DALAM MENINGKATAN KINERJA WAKTU PROYEK (STUDI KASUS : PROYEK JEMBATAN 5 PIK 2 TANGERANG,BANTEN). Diploma thesis, ITPLN.