Items where Division is "S1 Teknik SIpil" and Year is 2026

Group by: Creators | Item Type | No Grouping
Number of items: 9.

ARDIASYAH, MUHAMAD DAFFA FADHIL and Hayati, Kemala (2026) ANALISIS COST OVERRUN AND TIME OVERRUN DENGAN MENGGUNAKAN METODE EARNED VALUE. Diploma thesis, Institut Teknologi PLN.

Paramita, Nadia (2026) THE ACCELERATION SECRETS WATER, SANITATION AND HYGIENE (WASH). Institut Teknologi PLN (ITPLN), Jakarta. (In Press)

Putu Dela Puspita Yanti, NI and Lestari, Endah (2026) ANALISIS POTENSI PEMBANGUNAN PLTMH BERBASIS ENERGI POTENSIAL BUATAN PADA AREA TAMAN KOLABORASI ITPLN. Other thesis, INSTITUT TEKNOLOGI PLN.

Rizqulloh, Muhammad Daafa' and Lestari, Endah (2026) SIMULASI NORMALISASI DAN PENAMBAHAN KOLAM RETENSI UNTUK REDUKSI BANJIR TERHADAP SALURAN DRAINASE JL. LEWA XV KELURAHAN PEKAYON, JAKARTA TIMUR. Other thesis, Institut Teknologi PLN.

Satria, Rehan (2026) STABILISASI TANAH LUNAK DENGAN ABU CANGKANG KERANG HIJAU DITINJAU DARI UJI KONSOLIDASI. Other thesis, Institut Teknologi PLN.

Satria, Rehan (2026) STABILISASI TANAH LUNAK DENGAN ABU CANGKANG KERANG HIJAU DITINJAU DARI UJI KONSOLIDASI. Other thesis, Institut Teknologi PLN.

Tinulana, Salila (2026) ANALISIS PRODUKTIVITAS TUNNEL BORING MACHINE PADA PEKERJAAN PENGGALIAN TUNNEL HARMONI–SAWAH BESAR PROYEK MRT JAKARTA FASE 2A (CP202). Other thesis, Institut Teknologi PLN.

rachman, arif (2026) ANALISIS VOLUME DAN KARAKTERISTIK DI RUAS JALAN R.E.MARTADINATA JAKARTA UTARA AKIBAT PROYEK JALAN TOL ANCOL TIMUR - PLUIT. Other thesis, IT PLN.

sri dewi, puspita and supriadi, tarigan and deci trihap, sari and jaka pradana, cesario (2026) ANALISIS FAKTOR-FAKTOR PENYEBAB RISIKO KETERLAMBATAN WAKTU PADA PROYEK PEMBANGUNAN RUMAH SUSUN AYASA TOWER B NUANSA CILANGKAP. Diploma thesis, IT PLN.

This list was generated on Wed Apr 1 08:04:59 2026 WIB.