Items where Subject is "Manajemen Konstruksi"

Group by: Creators | Item Type
Jump to: A | H | R | S | T
Number of items at this level: 10.

A

Abid, Fikarurazzan and Kusumastuti, Dyah Pratiwi (2024) ANALISIS DAYA DUKUNG FONDASI PADA TOWER T.026 SUTET 500 KV TX (UNGARAN - PEDAN) – BATANG SECTION 1. Diploma thesis, ITPLN.

Adviani, Bunga Permata and Hidayat, Imron (2025) Peningkatan Efektivitas Pemasaran Proyek Konsultansi Enjiniring Ketenagalistrikan Melalui Implementasi Sistem Lessons Learned (LL) Terstruktur di PT PLN Enjiniring. Diploma thesis, Institut Teknologi PLN.

Aina, Insani Qori and Hidayat, Wiza (2025) PERENCANAAN IMPLEMENTASI BUILDING MANAGEMENT SYSTEM UNTUK GEDUNG PERKANTORAN PLN DI INDONESIA. Diploma thesis, Institut Teknologi PLN.

Apriliyani, Mutiara and Hayati, Kemala (2024) ANALISIS PERCEPATAN DURASI PEKERJAAN MENGGUNAKAN METODE FAST TRACK (Studi Kasus: Proyek Jakarta Gelora Marriott Hotel). Diploma thesis, ITPLN.

H

Hidayat, Luthfi and Sepriyanna, Irma (2024) ANALISA PERHITUNGAN PRODUKTIVITAS ALAT BERAT PADA PEKERJAAN PONDASI BORE PILE PROYEK BSI TOWER. Diploma thesis, ITPLN.

Hidayawanti, Ranti and Amany, Nisa Alya and Latief, Yusuf (2024) Integrating ISO 56002:2019 Organizational Context Evaluation with Lean Six Sigma for Cultivating an Innovation Culture in Precast Concrete Companies in Indonesia. E3S Web of Conferences, 517: 05026. pp. 1-6. ISSN 25550403

R

Rahmadi, Didik (2026) PENERAPAN METODE CUT OFF SINGLE PHI INCOMER TERHADAP KEANDALAN DAN KEAMANAN SISTEM TRANSMISI TENAGA LISTRIK SUTT 150 KV TEGINENENG – METRO. Diploma thesis, Institut Teknologi PLN.

Rahman, Achiarli Khalilul and Hidayat, Imron (2026) ANALISIS PENYUSUNAN HARGA PERKIRAAN SENDIRI (HPS) PADA PENGADAAN JASA KONSULTANSI DENGAN METODE PENUNJUKAN LANGSUNG (Studi Kasus: Pekerjaan Assesment Pondasi Tower SUTT 150 kV Kenten – Tanjung Api Api Tahun 2025). Diploma thesis, ITPLN.

S

Sormin, Rahmad Andi Arse and Hidayat, Wiza (2026) PELAKSANAAN RENOVASI OPTIMASI RUANG KERJA DI GEDUNG UTAMA PT PLN (PERSERO) KANTOR PUSAT DITINJAU DARI ASPEK MANAJEMEN BIAYA, MUTU DAN WAKTU. Diploma thesis, Institut Teknologi PLN Jakarta.

T

Tumewu, Dewi and Tambunan, Handrea Bernando (2025) Pengembangan Mekanisme Monitoring Termin Kontrak Jasa Enjiniring Ketenagalistrikan sebagai Instrumen Pengendalian Kinerja Pendapatan Direktorat Enjiniring. Diploma thesis, Institut Teknologi PLN.

This list was generated on Wed Apr 1 07:41:29 2026 WIB.