Abstract
Waduk Cirata merupakan waduk yang menggenangi 3 wilayah kabupaten yaitu Cianjur, Bandung Barat, dan Purwakarta. Dengan luas 62 km2 dan total tampungan sebesar 2.165.000.000 m3. Sedimentasi menjadi salah satu permasalahan di Waduk Cirata. Sedimen tersebut berdampak pada pengurangan kapasitas maupun umur fungsi waduk. Laju sedimentasi Waduk Cirata pada tahun 2012 mencapai 5,727 juta m3/tahun lebih besar dari laju sedimentasi desain yaitu sebesar 2,2 juta m3/tahun. Oleh karena itu sabo dam merupakan salah satu solusi yang dapat dilakukan guna mengendalikan sedimentasi pada daerah sungai-sungai inlet Waduk Cirata. Tujuan dari penelitian ini adalah merencanakan desain bangunan pengendali sedimen yang aman terhadap stabilitas serta mengetahui volume tampungan sedimennya. Metode yang digunakan dalam penelitian ini adalah melakukan analisa hidrologi terhadap data debit Sungai Cimeta hasil pengukuran AWLR 16 tahun Stasiun Cirata hingga didapatkan debit banjir rencana kala ulang tahunan. Debit yang didapatkan digunakan untuk menghitung desain sabo dam. Selanjutnya desain sabo dam tersebut dihitung stabilitas dan volume tampungnya. Berdasarkan perhitungan yang dilakukan didapatkan tinggi peluap sabo dam 5,725 m, tinggi bendung utama 4 m dengan kemiringan hulu 1:0,7 dan hilir 1:0,2. Panjang apron 15 m, dan tinggi sub sabo dam 2 m. Volume tampungan 3.733,912 m3 atau 35,36 % total sedimentasi pada Sungai Cimeta.
Cirata Reservoir is a reservoir that inundated 3 districts, which are Cianjur, West Bandung, and Purwakarta. In the large of 62 km2 area and 2,165,000,000 m3 total water storage. Sedimentation becomes one of the problems in Cirata Reservoir. The sediments have an impact on the reduction of capacity and the age of the reservoir function. The rate of Cirata Reservoir sedimentation in 2012 has 5.727 million m3 / year, more than sedimentation rate design 2.2 million m3 / year. Therefore, Sabo dam construction is one of the solution that can be done to control sedimentation in the Cirata Reservoir inlet rivers. The Purpouses of this reaserch are for planning the design of sediment control dam which is safe on stability and knowing sediment volume storage. The method that is used in this research is by conducting hydrological analysis of Cimeta River discharge from AWLR measurement in 16 years Cirata Station to get the annual plan flood. The received debit is used to calculate sabo dam design. Then the sabo dam design is calculated the stability and the storage capacity. Based on the calculation, the result of sabo dam design are high of sabo dam opening is 5.725 m, total height of main dam is 4 m with upstream slope 1:0.7 and downstream slope 1:0.2. Length of apron is 15 m, and total height of sub sabo dam is 2 m. Sediment storage capacity is 3,733.912 m3 or 36.35% of total sedimentation in the Cimeta River.
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | Sabo Dam, Sedimentasi, Umur Fungsi Waduk, AWLR Sabo Dam, Sedimentation, age of the reservoir function, AWLR |
Subjects: | Bidang Keilmuan > Teknik Sipil Skripsi |
Divisions: | Fakultas Teknologi Infrastruktur dan Kewilayahan > S1 Teknik SIpil |
Depositing User: | Sudarman |
Date Deposited: | 13 Sep 2025 08:44 |
Last Modified: | 13 Sep 2025 08:44 |
URI: | https://repository.itpln.ac.id/id/eprint/1027 |