Surahman, Ganda and Handayasari, Indah (2017) PENGARUH PENAMBAHAN KAPUR DAN KAOLIN DITINJAU DARI KUAT GESER TANAH RESIDUAL PADA PROYEK RENOVASI STADION RENANG KAWASAN GELORA BUNG KARNO. Diploma thesis, ITPLN.
![[thumbnail of GANDA SURAHMAN.pdf]](https://repository.itpln.ac.id/style/images/fileicons/text.png)
GANDA SURAHMAN.pdf
Restricted to Registered users only
Download (7MB)
Abstract
Tanah residual pada proyek renovasi stadion renang gelora bung karno termasuk tanah lempung coklat serta memiliki kohesi, sudut geser yang sangat kecil dan memiliki indeks plastisitas yang cukup tinggi. Keadaan ini membuat tanah pada sekitar stadion renang tidak stabil. Oleh karena itu, perlu dilakukannya perbaikan tanah pada kawasan stadion renang. Tujuannya agar tanah residual pada proyek renovasi stadion renang kawasan gelora bung karno dapat digunakan kembali. Metode memperbaiki keadaan tanah yang digunakan yaitu dengan cara kimiawi. Penelitian ini menggunakan kapur dan kaolin sebagai bahan campuran, dengan variasi kapur 3 %, 6 %, 9 %, 12 %, 15 % dan kaolin 10% dari berat sampel tanah dengan lama pengeraman 4 hari, 7 hari dan 14 hari. Dari variasi campuran kapur 3%, 6%, 9%, 12%, 15% dan kaolin 10% dari berat sampel tanah, didapatkan nilai persentase optimum penambahan kapur dan kaolin adalah pada tanah dengan campuran 9% kapur dan 10% kaolin dengan lama pemeraman 14 hari. Dimana tanah dengan campuran 9% kapur dan 10% kaolin dengan lama pemeraman 14 hari memiliki specific gravity 1,9220, batas cair 50,7290 %, batas plastis 34,1463 %, indeks plastisitas 16,5827 %, batas susut 20,4097 %, kohesi 1,1499 kg/cm2, dan nilai sudut geser 38°39'36''. Dari hasil penelitian ini penggunaan kapur dan kaolin sebagai bahan perbaikan tanah mampu memperbaiki kondisi tanah residual pada proyek renovasi stadion renang kawasan gelora bung karno.
Residual soil on the project renovation swimming stadium in gelora bung karno including brown clay has cohesion, friction angle is very small and high plasticity index. This condition makes the soil on unstable around the swimming stadium. Therefore, it is very important to do repairs of soil on the swimming stadium. The goal is residual soil on the project swimming stadium renovation in gelora bung karno reusable. Methods to improve the situation of soil used by way of chemical. This research uses lime and kaolin as a mixture, with a variation of lime 3%, 6%, 9%, 12%, 15% and kaolin 10% by weight of soil sample with ripening 4 days, 7 days, and 14 days.. Of the various mixture of lime 3%, 6%, 9%, 12%, 15% and kaolin 10% of the weight of soil samples, obtained optimum percentage value addition of limestone and kaolin are on the soil with a mixture 0f 9% lime and 10% kaolin with a long ripening 14 days. Where th soil with a mixture of 9% lime and 10% kaolin have specific gravity 1,9220, liquid limit 50,7290%, plastic limit 34,1463% Index Plasticity 16,5827%, shrinkage limit 20,4097 %, cohesion 1,1499 kg/cm2 and the value of the friction angle of 38039’36’’. From this research, the use of limestone and kaolin as soil improvement material capable of improving residual soil condition at the project swimming stadium renovation in gelora bung karno.
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | Tanah Residual, Kapur, Kaolin, Kohesi, Sudut Geser. Residual Soil, Lime, Kaolin, Cohesion, Friction Angle. |
Subjects: | Bidang Keilmuan > Teknik Sipil Skripsi |
Divisions: | Fakultas Teknologi Infrastruktur dan Kewilayahan > S1 Teknik SIpil |
Depositing User: | Sudarman |
Date Deposited: | 13 Sep 2025 10:01 |
Last Modified: | 13 Sep 2025 10:01 |
URI: | https://repository.itpln.ac.id/id/eprint/1031 |