PERENCANAAN PEMBANGKIT LISTRIK TENAGA SURYA ON GRID 5 kWp DI PANTI ASUHAN KARYA ANAK PERDAMAIAN JAYAPURA

Wona, Sarah Martlexya Virginya and Qosim, Muchamad Nur (2025) PERENCANAAN PEMBANGKIT LISTRIK TENAGA SURYA ON GRID 5 kWp DI PANTI ASUHAN KARYA ANAK PERDAMAIAN JAYAPURA. Diploma thesis, Institut Teknologi PLN.

[thumbnail of SKRIPSI 202111286 SARAH M V WONA.pdf] Text
SKRIPSI 202111286 SARAH M V WONA.pdf
Restricted to Repository staff only

Download (3MB)

Abstract

Perencanaan pembangunan Pembangkit Listrik Tenaga Surya (PLTS) On Grid dengan kapasitas 5 kWp di Gedung Panti Asuhan Karya Anak Perdamaian dilakukan dengan sistem atap, sehingga tidak memerlukan lahan tambahan. Berdasarkan survei, Gedung tersebut memiliki beban harian sebesar 6684 kW. Perencanaan ini melibatkan pemasangan PLTS On Grid berkapasitas 5 kWp, terdiri dari 12 panel surya yang disusun dalam 2 string dengan masing-masing string terdiri dari 6 panel, menggunakan inverter berkapasitas 5000 VA. Penelitian ini menghasilkan rasio kinerja (Performance Ratio) sebesar 79%, yang melebihi ambang batas 70%, sehingga proyek ini dinilai layak. Analisis kelayakan ekonomi menunjukkan bahwa investasi awal sebesar Rp. 84.927.151 dapat dikembalikan dalam Waktu 3 tahun dan 3 bulan. Nilai NPV (Net Present Value), PI (Profitability Index), dan IRR (Internal Rate of Return) yang positif menunjukkan bahwa proyek ini layak untuk dilaksanakan.

Planning for the construction of an On Grid Solar Power Plant (PLTS) with a capacity of 5 kWp at the Karya Anak Selamat Orphanage Building is carried out with a roof system, so it does not require additional land. Based on the survey, the building has a daily load of 6684 kW. This plan involves the installation of an On Grid PLTS with a capacity of 5 kWp, consisting of 12 solar panels arranged in 2 strings with each string consisting of 6 panels, using an inverter with a capacity of 5000 VA. This research resulted in a performance ratio of 79%, which exceeds the 70% threshold, so this project is considered feasible. The economic feasibility analysis shows that the initial investment is Rp. 84,927,151 can be returned within 3 years and 3 months. Positive NPV (Net Present Value), PI (Profitability Index) and IRR (Internal Rate of Return) values indicate that this project is feasible toimplement.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: NPV,Investasi,Performance ratio NPV, Investment, Performance Ratio
Subjects: Bidang Keilmuan > Electrical Engineering
Skripsi
Bidang Keilmuan > Teknik Elektro
Divisions: Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro
Depositing User: Budi Herdiansyah
Date Deposited: 26 Aug 2025 02:24
Last Modified: 29 Aug 2025 07:18
URI: https://repository.itpln.ac.id/id/eprint/122

Actions (login required)

View Item
View Item