Rusli, Andi Ikram Azhari and Hayati, Kemala (2024) ANALISIS KEBUTUHAN DAN WASTE MATERIAL BESI TULANGAN PADA PEKERJAAN STRUKTUR KOLOM DAN BALOK DENGAN METODE BAR BENDING SCHEDULE (BBS) (Studi Kasus: Proyek Pembangunan Dipo Center Slipi). Diploma thesis, ITPLN.
![[thumbnail of SKRIPSI_ANDI IKRAM AZHARI RUSLI_202021044.pdf]](https://repository.itpln.ac.id/style/images/fileicons/text.png)
SKRIPSI_ANDI IKRAM AZHARI RUSLI_202021044.pdf
Restricted to Repository staff only
Download (17MB)
Abstract
Perencanaan dan pengelolaan material konstruksi yang efektif sangat penting dalam proyek pembangunan untuk mengurangi pemborosan dan meningkatkan efisiensi biaya. Salah satu material utama dalam struktur beton bertulang adalah besi tulangan, yang sering mengalami kelebihan pemakaian atau Waste akibat perencanaan dan eksekusi yang kurang optimal. Penelitian ini bertujuan untuk menganalisis kebutuhan serta Waste material besi tulangan pada pekerjaan struktur kolom dan balok dengan menerapkan metode Bar Bending Schedule (BBS) pada program Microsoft Excel. Metode penelitian yang digunakan mencakup pengumpulan dan analisis data, spesifikasi teknis, gambar kerja, serta perhitungan kebutuhan. Hasil penelitian ini diperoleh kebutuhan tulangan pada masing-masing tipe kolom yaitu 22.415,808 kg pada D22, 75,744 kg pada D16, 34.973,688 kg pada D13 dan 385,008 kg pada D10. Pada pekerjaan Balok diperoleh kebutuhan tulangan 45.870,04 kg pada D22 , 6.607 kg pada D19, 1.590,62 kg pada D16, 6.678,06 kg pada D13 dan 10.454,61 kg pada D10. Dengan jumlah kebutuhan biaya tulangan berdasarkan Bar Bending Schedule pada pekerjaan kolom dan balok sebesar Rp. 1.550.320.400.
Effective planning and management of construction materials are essential in construction projects to reduce Waste and improve cost efficiency. One of the main materials in reinforced concrete structures is reinforcing steel, which often experiences excess use or Waste due to less than optimal planning and execution. This study aims to analyze the needs and Waste of reinforcing steel materials in column and beam structure work by applying the Bar Bending Schedule (BBS) method in the Microsoft Excel program. The research methods used include data collection and analysis, technical specifications, working drawings, and calculation of needs. The results of this study obtained the need for reinforcement in each type of column, namely 22,415.808 kg in D22, 75.744 kg in D16, 34,973.688 kg in D13 and 385.008 kg in D10. In the Beam work, the reinforcement requirement is 45,870.04 kg at D22, 6,607 kg at D19, 1,590.62 kg at D16, 6,678.06 kg at D13 and 10,454.61 kg at D10. With the total reinforcement cost requirement based on the Bar Bending Schedule on the column and beam work of Rp. 1,550,320,400.
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | Serat daun nanas, sifat mekanik beton, kuat tekan beton, kuat tarik belah, modulus elastisitas, beton serat, teknik sipil, material tambahan beton, pengujian material konstruksi, benda uji silinder, serat alami, limbah pertanian, bahan ramah lingkungan, mix design beton. |
Subjects: | Bidang Keilmuan > Teknik Sipil Bidang Keilmuan > Materials Science Skripsi Bidang Keilmuan > Teknik Lingkungan |
Divisions: | Fakultas Teknologi Infrastruktur dan Kewilayahan > S1 Teknik SIpil |
Depositing User: | Sudarman |
Date Deposited: | 26 Aug 2025 07:03 |
Last Modified: | 27 Aug 2025 08:06 |
URI: | https://repository.itpln.ac.id/id/eprint/152 |