ANALISIS SIMULASI PERENCANAAN PEMBANGUNAN PENYULANG BARU PEMECAH BEBAN PENYULANG BINOR MENGGUNAKAN SOFTWARE ETAP UNTUK EVAKUASI DAYA GI PAITON KE GI KRAKSAAN PT PLN (PERSERO) ULP KRAKSAAN

Camarita, Niken Endras and Erlina, Erlina (2025) ANALISIS SIMULASI PERENCANAAN PEMBANGUNAN PENYULANG BARU PEMECAH BEBAN PENYULANG BINOR MENGGUNAKAN SOFTWARE ETAP UNTUK EVAKUASI DAYA GI PAITON KE GI KRAKSAAN PT PLN (PERSERO) ULP KRAKSAAN. Diploma thesis, Institut Teknologi PLN.

[thumbnail of SKRIPSI 202211627 NIKEN ENDRAS CAMARITA.pdf] Text
SKRIPSI 202211627 NIKEN ENDRAS CAMARITA.pdf
Restricted to Registered users only

Download (7MB)

Abstract

Jaringan listrik yang dirancang dengan baik dapat menjaga kontinuitas penyaluran listrik serta menekan susut teknis dan penurunan tegangan. Gardu Induk Paiton hanya memiliki satu trafo yang menyuplai tiga penyulang. Penyulang Binor memiliki beban tertinggi, dan pada awal tahun 2024 ditemukan adanya kebocoran trafo GI sehingga diperlukan pemeliharaan. Oleh karena itu memerlukan pelimpahan beban ke Penyulang Jabung yang disuplai dari GI Kraksaan. Jika seluruh beban Penyulang Binor dipindahkan ke Penyulang Jabung, saat beban puncak arusnya akan melebihi kapasitas maksimum berisiko menyebabkan trip PMT dan meningkatkan susut teknis. Untuk mengatasi masalah ini, PLN merencanakan pembangunan penyulang baru dari GI Kraksaan yang diharapkan juga dapat memecah beban Penyulang Binor dan Penyulang Jabung saat kondisi normal sehingga memperkuat keandalan sistem jaringan distribusi ULP Kraksaan. Menggunakan software ETAP dan perhitungan matematis, diketahui bahwa upaya pembangunan penyulang baru dapat menurunkan susut teknis Penyulang Jabung saat mendapat pelimpahan beban Penyulang Binor menjadi sebesar 6.267,15 kWh per hari. Selain itu, Penyulang Binor mengalami penurunan nilai susut teknis menjadi sebesar 2.685,92 kWh per hari dan Penyulang Jabung mengalami penurunan nilai susut teknis menjadi sebesar 1.121,93 kWh per hari setelah dilakukan pemecahan sebagian beban penyulang.

Well-designed power system can maintain continuity of power distribution and reduce technical losses and voltage drops. GI Paiton has only one transformer serving three feeders. Binor feeder has the highest load and in early 2024 was found that there was a leakage in GI transformer which required maintenance. Therefore, necessary to transfer the load to Jabung feeder, which is supplied by GI Kraksaan. If Binor feeder’s entire load is transferred to Jabung feeder, current will exceed maximum capacity during peak load, with risk of PMT tripping and increasing technical losses. To overcome this problem, PLN plans to build new feeder from GI Kraksaan, which is also expected to load devide of Binor and Jabung feeder during normal conditions, thus strengthening ULP Kraksaan’s distribution power system. Using ETAP software and mathematical calculations shows that new feeder can reduce Jabung feeder’s technical losses when it gets the Binor feeder’s load to 6,267.15 kWh per day. In addition, Binor feeder’s technical losses can decrease to 2,685.92 kWh per day and Jabung feeder’s technical losses can decrease to 1,121.93 kWh per day after devide some of feeder load.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: susut teknis, pecah beban, software ETAP technical losses, load devide, ETAP software
Subjects: Bidang Keilmuan > Electrical Engineering
Skripsi
Bidang Keilmuan > Teknik Elektro
Divisions: Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro
Depositing User: Budi Herdiansyah
Date Deposited: 10 Oct 2025 02:06
Last Modified: 10 Oct 2025 02:06
URI: https://repository.itpln.ac.id/id/eprint/2034

Actions (login required)

View Item
View Item