Putra, Rayyan Muslim and Erlina, Erlina and Suyanto, Heri (2021) KAJIAN KELAYAKAN PERENCANAAN PEMBANGKIT LISTRIK TENAGA SAMPAH (PLTSa) DENGAN DAYA 750kW DI KELURAHAN TANJUNG SELAMAT KABUPATEN ACEH BESAR. Diploma thesis, ITPLN.
SKRIPSI 201611203 RAYYAN MUSLIM PUTRA.pdf
Restricted to Registered users only
Download (1MB)
Abstract
Pengembangan pembangkit listrik tenaga sampah (PLTSa) merupakan solusi energi terbarukan agar dapat membantu mengurangi ketergantungan terhadap energi fosil. Oleh sebab itu perlu adanya pengembangan sumber energi alternatif lain seperti sampah yang digunakan sebagai solusi dalam menekan pengguanaan bahan bakar fosil. Kajian Kelayakan Perencanaan Pembangkit Listrik Tenaga Sampah (Pltsa) Dengan Daya 750kw Di Kelurahan Tanjung Selamat Kabupaten Aceh Besar membutuhkan 4 unit Trillion Gasifier (TG180) serta 2 unit genset caterpillar G3215 dengan output 750 kW. PLTSa dengan berbahan bakar pelet sampah dianggap lebih efisien serta layak dibangun dikarenakan pertimbangan investasi sejumlah Rp 13.585.285.900, dengan harga jual listrik Rp. 1.500,- per kWh serta bunga bank 12% pertahun memproduksi NPV 8.722.830.785, -, IRR 19, 847% %, BCR 1,642 dan PBP 3 Tahun 8 bulan. Maka pemanfaatan pelet sampah selaku bahan bakar PLTSa gasifikasi Downdraft sangatlah layak dibangun di Kelurahan Tanjung Selamat.
The waste power plant (PLTSa) development is a renewable energy solution which could help to reduce dependency on fossil energy. Therefore it is essential to developt other alternative energy sources such as waste which is used as a solution to suppress the use of fossil fuels. A Feasibility Study on Planning for a 750kw Waste Power Plant (Pltsa) In Tanjung Selamat Village, Aceh Besar City, it required 4 units of Trillion Gasifier (TG180) and 2 units of caterpillar G3215 generator with 750 kW output. PLTSa using waste pellet fuel is far more efficient and feasible to construct because the investment of Rp. 13,585,285,900 using an electricity selling price of Rp. 1,500, - per kWh and 12% per year bank’s interest generating NPV 8,722,830,785, -, IRR 19, 847 %%, BCR 1,642 and PBP 3 years and 8 months. The use of garbage pellets as fuel for PLTSa in the Downdraft classification is very feasible to build in Tanjung Selamat.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | PLTSa, Gasifikasi, Sampah PLTSa, Gasification, Trash |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Elektro |
| Divisions: | Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro |
| Depositing User: | Sudarman |
| Date Deposited: | 15 Oct 2025 06:08 |
| Last Modified: | 15 Oct 2025 06:08 |
| URI: | https://repository.itpln.ac.id/id/eprint/2354 |
