Walukow, Yosua Yulian and Purwanto, Sugeng and Gifson Hutajulu, Albert (2021) PERENCANAAN PEMBANGUNAN JARINGAN TEGANGAN MENENGAH PADA PERTAMBANGAN EMAS JRBM DI KOTAMOBAGU, SULAWESI UTARA. Diploma thesis, ITPLN.
SKRIPSI 201611217 YOSUA YULIAN WALUKOW.pdf
Restricted to Registered users only
Download (7MB)
Abstract
Seiring dengan berkembangnya pertumbuhan ekonomi dan jumlah penduduk, jadi hal ini menimbulkan adanya permitaan beban yang bertambah dan diperlukan penyambungan saluran baru jaringan tegangan menengah. Jaringan tegangan menengah adalah bagian hilir nya sebuah jaringan sistem tenaga listrik dengan nilai tegangan sebesar 20kV. Tahap perencanaan dan pemasangan suatu jaringan distribusi tegangan menengah dimulai dengan survei lapangan untuk mendapatkan data yang nantinya akan digunakan dalam penentuan kapasitas trafo pembebanan,jenis penghantar,jenis tiang yang akan digunakan,jalur Saluran Udara Tegangan Menengah. Pada penelitian kali ini yang menjadi object tempat penelitian nya adalah Pertambangan Emas JRBM dengan jumlah beban 1770 dimana didapat dari Pompa air besar dengan kapasitas daya 160 dengan jumlah 3 maka total daya 480, Crusher (pemecah batu) dengan kapasitas daya 220 dengan jumlah 3 maka total daya 660, Konveyor dengan kapasitas daya 30 dengan jumlah 6 maka total daya 180, Pompa air kecil dengan kapasitas 55 dengan jumlah 6 maka total daya 330, Penerangan dengan kapasitas 120 dengan jumlah 1 maka total daya 120, dan permintaan daya terpasang yaitu 2075VA. Setelah mendapatkan data-data yang di perlukan di lapangan, tahap selanjutnya adalah pemasangan yang mengacu pada rancangan perencanaan yang sudah dibuat meliputi konstruksi pemasangan trafo pada gardu dalam atau gardu tembok, penanaman tiang, pemilihan penghantar. Berdasarkan dari hasil pengolahan data maka di dapatkan besarnya kapasitas trafo yang di pakai sebesar 3000kVA, Gardu dalam atau gardu tembok, penghantar AAAC-S,150mm2 dengan KHA sebesar 3,152A. Dalam penelitian ini hanya mencakup perencanaan dan kontruksi jaringan Distribusi Tegangan Menengah yang bermula dari Gardu hubung hingga Saluran Udara Tegangan Menengah.
Along with the economic growth and population, so this raises an increased demand for loads and it is necessary to connect a new medium voltage network line. The medium voltage network is the downstream part of an electric power system network with a voltage value of 20kV. The planning and installation phase of a medium voltage distribution network begins with a field survey to obtain data that will later be used in determining the loading transformer capacity, the type of conductor, the type of pole to be used, the Medium Voltage Air Line line. In this research, the object of the research is JRBM Gold Mining with a load of 1930 which is obtained from a large water pump with a power capacity of 160 number 4, the total power is 640, Crusher (stone breaker) with a power capacity of 220 with a total of 3, the total power is 660, Conveyors with a power capacity of 30 with a total of 6, the total power is 180, Small water pump with a capacity of 55 with a total of 6 then the total power is 330 , Lighting with a capacity of 120 with a total of 1, the total power is 120, and the installed power demand is 2075VA. After getting the data needed in the field, the next stage is installation that refers to the planning design that has been made including the construction of a transformer installation at an inner substation or wall substation, planting poles, selecting a carrier. Based on the results of data processing, the amount of transformer capacity used is 3000kVA, inner substations or wall substations, AAAC-S carriers, 150mm2 with a KHA of 3.152A, 12m steel poles and 9m steel poles with 200daN mechanical load strength. In this study only includes the planning and construction of the Medium Voltage Distribution network starting from the Distribution Substation to the Medium Voltage Air Line.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | jaringan tegangan menengah, perencanaan, pertambangan emas medium voltage network, planning, gold mine |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Elektro |
| Divisions: | Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro |
| Depositing User: | Sudarman |
| Date Deposited: | 15 Oct 2025 06:24 |
| Last Modified: | 15 Oct 2025 06:24 |
| URI: | https://repository.itpln.ac.id/id/eprint/2358 |