PT. PLN (Persero) GI Sayung merupakan salah satu cabang dari PT. PLN (Persero) UP2D Jateng & DIY. Untuk menjaga kontinuitas penyaluran energi listrik pada penyulang SYG10, maka perlu di meminimalisir gangguan pada penyulang tersebut. Salah satu permasalahan pada penyulang SYG10 pada PT.PLN (Persero) GI Sayung ialah gangguan hubung singkat 3 phasa dan phasa ke tanah. Dibutuhkan penyetelan relay arus lebih (OCR) dan relay gagngguan tanah (GFR) yang sesuai kriteria proteksi untuk meminimalisir area gangguan.. Metode yang digunakan ialah melakukan perhitungan manual arus gangguan hubung singkat 3 fasa ,1 fasa serta waktu kerja relay pada 3 zona ,dimana zona 1: dari jarak PMT outgoing ke recloser 1 , zona 2: dari jarak recloser 1 ke recloser 2 , dan zona 3 dari jarak recloser 2 ke ujung jaringan. Koordinasi pada relay di PMT outgoing , recloser 1 dan recloser 2 telah terkoordinasi tergantung dari lokasi titik gangguannya. Adapun hasil penyetelan yang dari perhitungan di GI Sayung untuk penyulang SYG10 arus hubung singkat 3 fasa OCR PMT outgoing TMS = 0.4945, Recloser 1 TMS = 0.2664, Recloser 2 TMS = 0.099 . Pada arus hubung singkat 1 phasa ke tanah GFR outgoing TMS = 0.4945, Recloser 1 TMS = 0.2786, Recloser 2 TMS = 0.1146 .
PT. PLN (Persero) GI Sayung is a branch of PT. PLN (Persero) UP2D Central Java & DIY. To maintain the continuity of the distribution of electrical energy to the SYG10 feeder, it is necessary to minimize disturbance to the feeder. One of the problems in the SYG10 feeder at PT.PLN (Persero) GI Sayung is a 3-phase short circuit and a phase to the ground. It takes overcurrent relay (OCR) and ground disturbance relay (GFR) settings which are in accordance with the protection criteria to minimize the disturbance area. The method used is to perform manual calculations of short circuit fault currents in 3 phases, 1 phase and relay working time in 3 zones, where zone 1: from outgoing PMT distance to recloser 1, zone 2: from recloser 1 to recloser 2, and zone 3 from recloser 2 to the end of the network. The coordination on the relay in the outgoing PMT, recloser 1 and recloser 2 has been coordinated depending on the location of the fault point. The results of the settings from the calculations in Sayung GI for the SYG10 feeder short circuit current 3 phase OCR PMT outgoing TMS = 0.4945, Recloser 1 TMS = 0.2664, Recloser 2 TMS = 0.099. At 1 phase short circuit current to ground outgoing GFR TMS = 0.4945, Recloser 1 TMS = 0.2786, Recloser 2 TMS = 0.1146.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | Relay Arus Lebih, Relay Gangguan Tanah, Koordinasi, TMS. Over Current Relay, Ground Fault Relay, Coordination, TMS. |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Elektro |
| Divisions: | Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro |
| Depositing User: | Sudarman |
| Date Deposited: | 15 Oct 2025 07:32 |
| Last Modified: | 15 Oct 2025 07:32 |
| URI: | https://repository.itpln.ac.id/id/eprint/2379 |