PERENCANAAN JARINGAN TEGANGAN RENDAH 380/220V DI PERUMAHAN GRIYA HARMONI MEKARWANGI

Rere, Andre and handayani, oktaria and Azzahra, Septianissa (2021) PERENCANAAN JARINGAN TEGANGAN RENDAH 380/220V DI PERUMAHAN GRIYA HARMONI MEKARWANGI. Diploma thesis, ITPLN.

[thumbnail of SKRIPSI 201611050 ANDRE RERE.pdf] Text
SKRIPSI 201611050 ANDRE RERE.pdf
Restricted to Registered users only

Download (2MB)

Abstract

Jaringan Distribusi Tegangan Rendah yaitu tegangan yang memiliki nilai dibawah 1kV, dipakai sebagai penyaluran daya dari gardu distribusi kepada palnggan tegangan rendah , Dimana penyalurannya bekerja memakai sistem tiga fasa empat kawat serta dilengkapi dengan netral. . Indonesia sendiri memakai tegangan rendah 380/220V dimana tegangan 380V adalah besar tegangan antar fasa dan tegangan 220V yaitu tegangan fasa-netral. Dimana ruang Iingkup jaringan pada distribusi ini yang langsung berhubungan juga terletak pada Iingkungan daerah berpenghuni, sehingga wajib melaksanakan persyaratan kuaIitas teknis peIayanan dan juga wajib memenuhi persyaratan aman untuk pengguna dan ramah Iingkungan. Pada peneIitian ini diIakukan perencanaan jaringan tegangan rendah di perumahan Griya Harmoni Mekarwangi dengan materiaI yaitu Trafo 315 kVA, tiang beton buIat sebanyak 25 batang diantaranya 5 batang 200 daN 10 batang 350 daN, kabeI NYY sepanjang 53 meter, kabeI twisted 3 x 70 mm² + netraI sepanjang 263 meter dan pembumian/Arde TR 4 buah. Dan daIam peneIitian ini juga ada perhitungan ekonomik teknik dengan metode payback periode berdasarkan investasi sebesar Rp. 432.203.211,- dan keuntungan sebesar Rp. 55.096.493/tahun. Maka jangka waktu pengembaIian yaitu selama 7,9 tahun.

At first the low voltage distribution network is a voltage that has a value below 1kV, is used as a distribution of power from the distribution substance to the low voltage palnggan, where the distribution works using a three-phase four-wire system and is equipped with neutral. Furthermore, Indonesia itself uses a low voltage of 380 / 220V where the 380V voltage is a large phase of phase and 220V voltage ie the phase-neutral voltage. Moreover, where the enclosure space of this network in which distribution is directly related to the connection of the encounter, so it must obtain the technical quanity of the peace services and also must meet the safe requirements for users and the widely environments. And then, in this study, the low-voltage network planning in Griya Harmoni Mekarwangi housing ¹ with materials is a 315 KVA transformer, a round concrete pole of 25 stems including 5 stems 200 and 10 rods 350 and the 53 meter ring Nyy, twisted 3 x 70 mm + neutral rounds are 263 meters and the 43-and-day array of electricity. And in this study there is also economic calculation of techniques with payback method period based on investment of Rp. 432.203,211, - and profit of Rp. 55.096.493 / year. So as a result, the run of the company is for 7.9 years..

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Jaringan Distribusi Tegangan Rendah, Perencanaan , Payback periode Iow VoItage Distribution Network, InstaIIation, Investment
Subjects: Skripsi
Bidang Keilmuan > Teknik Elektro
Divisions: Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro
Depositing User: Sudarman
Date Deposited: 15 Oct 2025 08:25
Last Modified: 15 Oct 2025 08:25
URI: https://repository.itpln.ac.id/id/eprint/2387

Actions (login required)

View Item
View Item