Listrik merupakan salah satu kebutuhan yang wajib ada untuk memenuhi kebutuhan sehari-hari. Disisi lain banyak daerah yang belum menikmati penggunaan listrik secara optimal. Ini dikarenakan oleh 2 faktor yang mempengaruhi kebutuhan masyarakat ini yaitu, kemampuan secara ekonomi dan kondisi geografis. Dimana penggunaan listrik di daerah maju akan lebih besar dibandingkan di daerah tertinggal. Ditinjau dari faktor kebutuhan sistem penyaluran listrik yang tersentralisasi belum bisa terlingkupi hingga ke seluruh wilayah yang membutuhkan. Salah satu wilayah yang memerlukan perhatian adalah Pulau Pramuka yang terletak cukup jauh dari pulau utama sebagai sentral teraliri energi listrik. Maka ide untuk memanfaatkan energi terbarukan secara lokal menjadi pilihan yang cukup optimal. Dalam kasus ini adalah Pembangkit Energi Listrik Tenaga Surya (PLTS). Maka agar berkembang dengan pasti, perlu dilakukan studi agar dapat diketahui kualitas dari sistem ini. Salah satunya adalah studi aliran daya baik itu keadaan sekarang maupun untuk kelangsungan tahun berikutnya. Setelah dilakukan studi aliran daya didapat bahwa PLTS di Pulau Pramuka layak untuk beroperasi dan mampu untuk digunakan selama 5 tahun ke depan, namun perlu perhatian untuk penghantar yang digunakan karena berpotensi untuk kelebihan beban.
Electricity is one of the necessities that must exist to meet daily needs. On the other hand, many areas have not yet enjoyed optimal use of electricity. This is due to 2 factors that influence the needs of this community, namely, economic capacity and geographical conditions. Where the use of electricity in developed areas will be greater than in disadvantaged areas. In terms of the need for a centralized electricity distribution system, it has not been able to cover all areas in need. One area that needs attention is Pramuka Island, which is located quite far from the main island as the center for electricity. So the idea of utilizing renewable energi lokally is a pretty optimal choice. In this case, it is the Solar Power Plant (PLTS). So in order to develop with certainty, it is necessary to conduct a study in order to know the quality of this system. One of them is the study of load flow analysis, both for the current situation and for the continuity of the following year. After conducting a load flow analysis, it was found that the PLTS on Pramuka Island is feasible to operate and capable of being used for the next 5 years, but attention needs to be paid to the conductors used because they have the potential to be overloaded.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | PLTS, aliran daya, energi solar power plant, load flow analysis, energi |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Elektro |
| Divisions: | Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro |
| Depositing User: | Sudarman |
| Date Deposited: | 16 Oct 2025 07:19 |
| Last Modified: | 16 Oct 2025 07:19 |
| URI: | https://repository.itpln.ac.id/id/eprint/2440 |