Hidayatullah, Regi Reynaldi and Hidayat, Syarif (2022) PERENCANAAN PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) OFF GRID DI MADAMNUM PATISSERIE BAKERY SHOP BANDA ACEH. Diploma thesis, ITPLN.
SKRIPSI 201611145 REGI REYNALDI HIDYATULLAH.pdf
Restricted to Registered users only
Download (2MB)
Abstract
Sebagai negara tropis, beberapa penelitian mengenai PLTS telah banyak dikembangkan. Selama ini studi penelitian mengenai perencanaan PLTS di Madamnum Patisserie Bakery Shop Banda Aceh belum pernah dilakukan padahal sistem PLTS bermanfaat dalam segi energi yang positif bagi sumber daya manusia karena tenaga surya merupakan energi bersih serta ramah lingkungan. Perencanaan pembangkit listrik tenaga surya (PLTS) off grid di Madamnum Patisserie Bakery Shop Banda Aceh ini direncanakan berdasarkan kebutuhan dari daya pada bakery shop yang dijadikan sebagai tempat penelitian. Energi matahari sebagai energi terbarukan sangatlah cocok digunakan sebagai salah satu energi alternatif untuk pemakaian di tempat seperti Madamnum Patisserie Bakery Shop Banda Aceh. Pada perencanaan ini digunakan metode kuantitatif dikarenakan penelitian ini dilaksanakan dengan menggunakan sistem perhitungan. Perencanaan pembangkit listrik tenaga surya ini membutuhkan biaya total sebesar Rp. 474.930.913,- dan beban sebesar 55,366 kWh. Dibutuhkan 50 buah modul surya dengan spesifikasi 300 WP, 68 baterai dengan spesifikasi 12 Volt 200 Ah, 1 solar charge controller dengan spesifikasi 500 Vdc 100 A, 1 inverter dengan spesifikasi 5 kW, dan 1 combiner box dengan spesifikasi dapat menampung hingga maksimum 24 string. Rasio Kinerja (PR) dalam perencanaan PLTS ini ialah 85% dan untuk pengembalian modal terjadi pada tahun ke 13 dari umur proyek 20 tahun sehingga perencanaan ini layak untuk dilaksanakan.
As a tropical country, several studies on solar power plants have been developed. So far, a research study on planning a solar power plant at the Madamnum Patisserie Bakery Shop Banda Aceh has never been carried out. In fact, the planning of solar power plants is beneficial in terms of positive energy for human resources because solar power is clean and environmentally friendly energy. The planning of the off-grid solar power plant (PLTS) at the Madamnum Patisserie Bakery Shop Banda Aceh is carried out based on the power requirements of the bakery shop which is used as a research site. Solar energy as a renewable energy is very suitable to be used as an alternative energy for use in places such as the Madamnum Patisserie Bakery Shop Banda Aceh. In this planning, quantitative methods are used because this research is carried out using calculating system. This solar power plant planning requires a total cost of Rp. 474.930.913, - and a load of 55,366 kWh. It takes 50 solar modules with specifications of 300 WP, 68 batteries with specifications of 12 Volt 200 Ah, 1 solar charge controllers with specifications of 500 Vdc 100 A, 1 inverter with specifications of 5 kW, and 1 combiner box with specifications that can accommodate a maximum of 24 strings. The Performance Ratio (PR) in this off-grid solar power plant planning is 85% and the return on capital occurs in the 13th year of the project's life of 20 years so that this plan is feasible to carry out.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | Pembangkit listrik tenaga surya off grid, perencanaan, energi terbarukan Off grid solar power plant, planning, renewable energy |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Elektro |
| Divisions: | Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro |
| Depositing User: | Sudarman |
| Date Deposited: | 16 Oct 2025 07:19 |
| Last Modified: | 16 Oct 2025 07:19 |
| URI: | https://repository.itpln.ac.id/id/eprint/2441 |