ANALISIS PARTIAL DISCHARGE PADA KABEL JARINGAN TEGANGAN MENENGAH 20 KV DI SISTEM UP3 KEBON JERUK

Baharudin, Alvin Sultan and Purwanto, Sugeng (2022) ANALISIS PARTIAL DISCHARGE PADA KABEL JARINGAN TEGANGAN MENENGAH 20 KV DI SISTEM UP3 KEBON JERUK. Diploma thesis, ITPLN.

[thumbnail of SKRIPSI 201711024 ALVIN SULTAN BAHARUDIN.pdf] Text
SKRIPSI 201711024 ALVIN SULTAN BAHARUDIN.pdf
Restricted to Registered users only

Download (4MB)

Abstract

Salah satu tugas dari perusahaan listrik adalah menghasilkan energi listrik yang dapat diandalkan oleh pelanggan. Gangguan tidak dapat dihindari, pelanggan adalah yang paling terdampak akibat adanya gangguan. Salah satu gangguan yang kerap terjadi adalah pada sisi distribusi pada kabel SKTM 20kV. Titik rawan dari gangguan pada kabel SKTM 20kV ada pada sambungan (Jointing), jenis gangguannya dikarenakan adanya Partial Discharge. Pada Gardu Induk New Senayan telah terjadi gangguan pada Jointing pada Penyulang Arloji segmen KJ 204 – KJ 317 dengan keadaan kabel sangat buruk. Titik gangguan ada pada jarak 916 m dengan kapasitas 0,297 μF pada fasa L1 dan L2 dan 0,296 μF untuk fasa L3 dengan frekuensi 338,03 Hz untuk fasa L1 dan L2 sedangkan untuk fasa L3 sebesar 338,98 Hz. Maka tindakan selanjutnya adalah dilakukannya assessment kabel untuk mengetahui gangguan pada saluran kabel dan lokasi titik gangguan untuk segera dilakukan perbaikan atau pergantian pada kabel.

One of the tasks of the power company is to produce electrical energy that customers can rely on. Disruption is unavoidable, customers are the most affected due to disruption. One of the disturbances that often occurs is on the distribution side of the 20kV SKTM cable. The vulnerable point of interference on the 20kV SKTM cable is at the connection (Jointing), the type of disturbance is due to Partial Discharge. At the New Senayan Substation there has been a disturbance in the Jointing of the Watch Feeder segment KJ 204 – KJ 317 with very bad cable conditions. The fault point is at a distance of 916 m with a capacity of 0.297 F in the L1 and L2 phases and 0.296 F for the L3 phase with a frequency of 338.03 Hz for the L1 and L2 phases while for the L3 phase it is 338.98 Hz. Then the next action is to carry out a cable assessment to find out the disturbance in the cable channel and the location of the point of disturbance for immediate repair or replacement of the cable.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Partial Discharge, SKTM, Assessment Partial Discharge, SKTM, Assessment
Subjects: Skripsi
Bidang Keilmuan > Teknik Elektro
Divisions: Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro
Depositing User: Sudarman
Date Deposited: 16 Oct 2025 08:03
Last Modified: 16 Oct 2025 08:03
URI: https://repository.itpln.ac.id/id/eprint/2450

Actions (login required)

View Item
View Item