ANALISIS ANOMALI HOTSTPOT PADA KLEM DISCONECTING SWITCH (PMS) UNIT LAYANAN TRANSMISI DAN GARDU INDUK TEGAL PADA GARDU INDUK 150 KV COMAL

Hidayat, Taufik and Putri, Tri Wahyu Oktaviana (2022) ANALISIS ANOMALI HOTSTPOT PADA KLEM DISCONECTING SWITCH (PMS) UNIT LAYANAN TRANSMISI DAN GARDU INDUK TEGAL PADA GARDU INDUK 150 KV COMAL. Diploma thesis, ITPLN.

[thumbnail of SKRIPSI 202011355 TAUFIK HIDAYAT.pdf] Text
SKRIPSI 202011355 TAUFIK HIDAYAT.pdf
Restricted to Registered users only

Download (5MB)

Abstract

Unit Layanan Transmisi dan Gardu Induk Tegal ditemukan anomali hotspot yaitu tepatnya pada wilayah kerja Gardu Induk 150 KV Comal dari hasil thermovisi yang ditemukan anomali hotspot yaitu pada PMS Bus 1 Bay Trafo 1 pada tanggal 02 April 2022 perlu dilakukan tindak lanjut yaitu berupa pemantauan menggunakan metode thermovisi, pemantauan beban dan tindakan perbaikan serta penulis bermaksud untuk menganalisis rugi rugi daya yang ditimbulkan akibat dari hotspot tersebut dengan melakukan pengamatan beban yang tercatat pada meter setiap jam 10.00 dan 19.00 sebagai acuan beban sementara untuk dapat dihitung rugi daya yang ditimbulkan pada tanggal 24 April 2022 dilakukan tindak lanjut perbaikan yaitu dengan melakukan pemeriksaan matrial, pengujian tahanan kontak, pembersihan matrial, dan pengukuran tahanan kontak sebelum dan setelah dilakukan perbaikan yaitu ditemukan hasil tahanan kontak sebelum 65.8 µΩ setelah perbaikan berkurang menjadi 19.5 µΩ (Kep.DIR 0520 K/DIR/2014) tentang standar pengujian tahanan kontak PMS sudah sesuai standar dibawah 50 µΩ. Hasil Pemeriksaan kondisi matrial baik namun perlu adanya pembersihan hasil perhitungan rugi daya manual sebelum perbaikan adalah 472,207 Watt setelah perbaikan terjadi penurunan yaitu 146,7 Watt dihitung menggunakan pengukuran beban tercatat pada jam 10.00 wib dan 19.00 wib dare tanggal 02 April 2022 sampai dengan 24 April 2022.

The Tegal Transmission Service Unit and Substation found a hotspot , precisely in the working area The 150 KV Comal Substation from the results of thermovision which found a hotspot anomaly, namely PMS Bus 1 Bay Transformer 1 on April 02, 2022, it is necessary to follow up in the form of monitoring using the thermovision method, monitoring the load and corrective action and the author intends to analyze the power losses incurred. caused by the hotspot by observing the load recorded on the meter every 10.00 and 19.00 hours as a temporary load reference to calculate the power loss caused on April 24, 2022, follow-up repairs are carried out, namely by conducting material inspections, testing contact resistance, cleaning materials , and The contact resistance measurement before and after the repair was found, the results of the contact resistance before 65.8 after the repair were reduced to 19.5 (Kep.DIR 0520 K/DIR/2014) regarding the PMS contact resistance testing standard, it was according to the standard below 50 . The results of the inspection of the material condition are good but it is necessary to clean the results of the manual power loss calculation before the repair is 472.207 Watts after the repair there is a decrease, namely 146.7 Watts calculated using recorded load measurements at 10.00 WIB and 19.00 WIB from April 2, 2022 to April 24, 2022:

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Anomali Hotspot, Rugi Daya Hotspot Anomaly, Power Loss
Subjects: Skripsi
Bidang Keilmuan > Teknik Elektro
Divisions: Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro
Depositing User: Sudarman
Date Deposited: 17 Oct 2025 03:47