IDENTIFIKASI FAKTOR YANG BERPENGARUH TERHADAP KINERJA WAKTU PELAKSANAAN PROYEK PEMBANGUNAN SALURAN TRANSMISI I5O KV DI WILAYAH KABUPATEN TANJIJNG JABUNG BARAT PROVINSI JAMBI

Vikoreza, Hasri and Alvianingsih, Ginas (2022) IDENTIFIKASI FAKTOR YANG BERPENGARUH TERHADAP KINERJA WAKTU PELAKSANAAN PROYEK PEMBANGUNAN SALURAN TRANSMISI I5O KV DI WILAYAH KABUPATEN TANJIJNG JABUNG BARAT PROVINSI JAMBI. Diploma thesis, ITPLN.

[thumbnail of SKRIPSI 202011297 HASRI VIKOREZA.pdf] Text
SKRIPSI 202011297 HASRI VIKOREZA.pdf
Restricted to Registered users only

Download (7MB)

Abstract

Saluran transmisi pada sistem ketenagalistrikan merupakan media yang digunakan untuk mentransmisikan energi listrik dari pusat listrik (pembangkit) menuju ke pusat beban (gardu induk). Seiring meningkatnya permintaan akan pasokan daya listrik di wilayah Kabupaten Tanjung Jabung Barat Provinsi Jambi, diperlukan tambahan pembangunan infrastruktur ketenagalistrikan termasuk pembangunan saluran transmisi 150 kV. Dalam proses pembangunan terjadi berbagai macam faktor yang mempengaruhi kinerja\waktu pelaksanaan, sehingga dilakukan penelitian untuk mengidentifikasi faktor yang berpengaruh terhadap kinerja waktu pelaksanaan. Hasil penelitian yang telah dilakukan maka terdapat 25 faktor yang memiliki pengaruh terhadap kinerja waktu pelaksanaan, dengan metode survey serta pengolahan data menggunakan Relative Importance Index (RII) didapatkan nilai 0.91 pada faktor proses pembebasan lahan dan adanya kesalahan pembuatan desain, 0.87 faktor data survey tidak akurat, adanya perubahan desain, lamanya proses review, 0.86 faktor investigasi yang tidak memadai, 0.83 faktor adanya metode konstruksi yang tidak tepat, 0.82 faktor adanya keterlambatan material dan permasalahan sosial, 0.81 faktor subkontraktor kurang kompeten, 0,80 faktor adanya kekurangan tenaga kerja, mobilisasi manpower tidak lancar, adanya kekurangan peralatan kerja, 0.79 faktor adanya permasalahan finansial, 0.78 faktor tenaga kerja berpengalaman tidak memadai dan peralatan kerja yang sering rusak, 0.77 faktor koordinasi yang kurang baik, 0.76 faktor adanya kesalahan dalam taksiran biaya, 0.75 faktor tidak tertibnya administrasi K3, 0.74 faktor tingkat kompleksitas desain proyek, 0.72 faktor tidak adanya personil K3, 0.71 faktor produktivitas yang rendah dari pekerja, 0.70 faktor kondisi geografis lokasi proyek yang sulit, 0.69 faktor penyelesaian pending pekerjaan, 0,66 faktor adanya penambahan scope pekerjaan diluar kontrak.

A transmission line on the power electricity system is a media that used to transmit electricity energy from the power plant to load center. In accordance increases the demand of electricity power energy for West Tanjung Jabung Regency Jambi Province, therefore, additional electricity infrastructure development is needed, including the construction of 150 kV transmission lines. In the process of implementing the construction of a 150 kV transmission line, there are various factors that affect the performance of time, so this research is carried out to identify factors that affect the performance of implementation time. The result of the research that has been done are that there are 25 factors that have been an influence on the performance of the project implementation time, and from the value of Relative Importance Index (RII) the result are 0,91 for land acquisition process and design error, 0.87 inaccurate survey data factors, design changes, the length of the review process, 0.86 inadequate investigation factors, 0.83 factors for inappropriate construction methods, 0.82 factors for material delays and social problems, 0.81 factors of incompetent subcontractors, 0.80 factors of lack of manpower, non-smooth manpower mobilization, lack of work equipment, 0.79 factors of financial problems, 0.78 factors of inadequate experienced workers and work equipment that is often damaged, 0.77 factors poor coordination, 0.76 factor of error in cost estimation, 0.75 factor of disorganized safety administration, 0.74 factor of project design complexity level, 0.72 factor of absence of safety officers, 0.71 factor of low productivity of workers, 0.70 factor of difficult project location geographical conditions , 0.69 worker's pending completion factor an, 0.66 the factor of the addition of the scope of work outside the contract.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Saluran Transmisi 150 kV, Faktor Kinerja Waktu, Proyek Pembangunan 150 kV Transmission Line, Performance of Time, Project Construction
Subjects: Skripsi
Bidang Keilmuan > Teknik Elektro
Divisions: Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro
Depositing User: Sudarman
Date Deposited: 17 Oct 2025 07:17
Last Modified: 17 Oct 2025 07:17
URI: https://repository.itpln.ac.id/id/eprint/2511