Pembangkit Listrik Tenaga Surya (PLTS) 120 kWp di PT.PJB UP Muara Karang merupakan salah satu pembangkit listrik yang digunakan untuk memasok daya pada beban yang terdapat di breaker Motor control center (MCC 5C) yang dimana berfungsi untuk mengurangi pemakaian sendiri pada unit PLTU 45 yang dihubungkan dengan grid PLN. Sistem PLTS 120 kWp yang dimiliki PT.PJB UP Muara Karang dibangun dan beroperasi sejak bulan Oktober 2021 perlu dilakukan perhitungan rasio performa, efisiensi dan perhitungan biaya investasi dan berapa lama modal akan kembali. Dari hasil perhitungan efisiensi panel modul surya ini memiliki nilai efisiensi tertinggi 18 % pada pukul 14.00, terendah 9,8 % pada pukul 08.00. dan nilai dari Performance Ratio didapat dengan rata-rata sebesar 84%. Menurut IEC sistem PLTS efektif atau layak digunakan jika nilai performa ratio nya sebesar 70% hingga mendekati 100%. dilakukan perhitungan efisiensi selama 8 bulan dari oktober hinga bulan mei 2022 pada ketiga inventer PLTS dimana nilai keluaran dari ketiga inverter rata-rata adalah 98,3% sehingga sesuai dengan data teknis yang tertera pada spesifikasi komponen yaitu 98,6%..Total biaya investasi untuk melakukan pemasangan PLTS On Grid 120 kWp di PT PJB UP Muara Karang yaitu sebesar Rp. 1.189.694.023,1.-. Biaya investasi awal pemasangan sistem PLTS ini akan balik modal selama 4,3 tahun dengan penghematan perbulannya sebesar Rp, 23.281.239−/Bulan

The 120 kWp Solar Power Plant (PLTS) at PT. PJB UP Muara Karang is one of the power plants used to supply power to the load contained in the breaker Motor control center (MCC 5C) which serves to reduce self-use in the PLTU 45 unit. connected to the PLN grid. The 120 kWp PLTS system owned by PT. PJB UP Muara Karang was built and operated since October 2021. It is necessary to calculate the ratio of performance, efficiency and calculation of investment costs and how long it will take for the capital to return. From the results of the calculation of the efficiency of this solar module panel, the highest efficiency value is 18% at 14.00, the lowest is 9.8% at 08.00. and the value of the Performance Ratio is obtained with an average of 84%. According to the IEC, the PLTS system is effective or feasible to use if the ratio performance value is 70% to close to 100%. Efficiency calculations were carried out for 8 months from October to May 2022 on the three PLTS inverters where the average output value of the three inverters was 98.3% so that it was in accordance with the technical data listed in the component specifications, namely 98.6%..Total investment costs to install PLTS On Grid 120 kWp at PT PJB UP Muara Karang, which is Rp. 1,189,694,023.1.-. The initial investment cost of installing this PLTS system will payback for 4.3 years with monthly savings of Rp. 23,281,239−/Month 3% so that it is in accordance with the technical data stated in the component specifications, which is 98.6%..The total investment cost to install PLTS On Grid 120 kWp at PT PJB UP Muara Karang is Rp. 1,189,694,023.1.-. The initial investment cost of installing this PLTS system will payback for 4.3 years with monthly savings of Rp. 23,281,239−/Month 3% so that it is in accordance with the technical data stated in the component specifications, which is 98.6%..The total investment cost to install PLTS On Grid 120 kWp at PT PJB UP Muara Karang is Rp. 1,189,694,023.1.-. The initial investment cost of installing this PLTS system will payback for 4.3 years with monthly savings of Rp. 23,281,239−/Month

Item Type: Thesis (Diploma)
Uncontrolled Keywords: PLTS, Suplay daya, Efisiensi, Rasio Performa,investasi. PLTS, power supply, efficiency, performance ratio, investment.
Subjects: Skripsi
Bidang Keilmuan > Teknik Elektro
Divisions: Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro
Depositing User: Sudarman
Date Deposited: 17 Oct 2025 08:26
Last Modified: 17 Oct 2025 08:26
URI: https://repository.itpln.ac.id/id/eprint/2531

Actions (login required)

View Item
View Item