RANCANG BANGUN FAST ATS (AUTOMATIC TRANSFER SWITCH) DALAM MENJAGA KEANDALAN PASOKAN LISTRIK DI KTT G20 BALI

Rachmandanu, Fachry and Sari, Dewi Purnama (2022) RANCANG BANGUN FAST ATS (AUTOMATIC TRANSFER SWITCH) DALAM MENJAGA KEANDALAN PASOKAN LISTRIK DI KTT G20 BALI. Diploma thesis, ITPLN.

[thumbnail of SKRIPSI 201811278 FACHRY RACHMANDANU.pdf] Text
SKRIPSI 201811278 FACHRY RACHMANDANU.pdf
Restricted to Registered users only

Download (4MB)

Abstract

PLN menjaga pasokan kelistrikan pada KTT G20 dengan menyiapkan gardu pemasok yang dilengkapi dengan Automatic Transfer Switch (ATS). Fast ATS ini dipasang untuk switching otomatis suplai aliran listrik untuk menghindari hilang tegangan. Penelitian ini bertujuan untuk mendesain sistem kerja dan kehandalan sistem jaringan listrik dari Fast ATS. Proses rancang bangun melalui tahap perencanaan, perancangan dan pengujian alat. Hasil penelitian ini sistem fast ats dengan hasil kehandalan. Hasil dari pengujian dengan rata -rata waktu perpindahan untuk CB1 ke CB2 sebesar 100,6 ms. Rata-rata waktu perpindahan CB2 ke CB3 sebesar 99,3 dan rata-rata waktu perpindahan CB3 ke CB1 sebesar 94,6. Dan rata-rata perpindahan antara CB1,2 dan 3 adalah 98,1 yang di setting tidak lebih dari 200 ms. Pada hasil pengujian dapat disimpulkan Fast ATS secara otomatis dapat memindahkan sumber tegangan PLN utama ke sumber tegangan PLN stanby sepersekian detik.

PLN maintains electricity supply at the G20 Summit by preparing supplier substations equipped with Automatic Transfer Switch (ATS). Fast ATS is installed for automatic switching of power supply to avoid Undervoltage . This study aims to design the work system and reliability of the electrical network system from Fast ATS. The design process goes through the stages of planning, designing and testing tools. The results of this study are fast ats system with reliability results. The results of the test with an average transfer time for CB1 to CB2 of 100.6 ms. The average transfer time from CB2 to CB3 is 99.3 and the average time to transfer from CB3 to CB1 is 94.6. And the average displacement between CB1,2 and 3 is 98.1 which is set not more than 200 ms. In the test results, it can be concluded that Fast ATS can automatically move the main PLN voltage source to the PLN standby voltage source for a fraction of a second.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Fast ATS,Hilang tegangan ,Switching,Keandalan Fast ATS, Undervoltage , Switching, Reliability
Subjects: Skripsi
Bidang Keilmuan > Teknik Elektro
Divisions: Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro
Depositing User: Sudarman
Date Deposited: 17 Oct 2025 08:43
Last Modified: 17 Oct 2025 08:43
URI: https://repository.itpln.ac.id/id/eprint/2534

Actions (login required)

View Item
View Item