Abstract
Pembangunan PLTA Cisokan merupakan Proyek Strategis Nasional dalam ranga percepatan pembangkit ramah lingkungan 5000 MW yang sudah dicanangkan oleh Bapak Presiden Republik Indonesia. Skema pumped storage hydropower 1040MW, akan menghasilkan listrik yang cukup besar pada saat beban puncak kebutuhan harian. Dengan tingkat pertumbuhan 6-7% per tahun, kebutuhan listrik pada jaringan interkoneksi Jawa Bali saat ini dilayani oleh pembangkit listrik berbahan bakar batubara, dan puncak permintaan yang terus meningkat dipenuhi oleh pembangkit listrik yang tidak ramah lingkungan. Debit andalan yang diperoleh ialah Q90 pada bulan-bulan yang berbeda adalah sebagai berikut 0,24 m3/s pada Januari, 0,28 m3/s pada Februari, 0,25 m3/s pada Maret, 0,29 m3/s pada April, 0,28 m3/s pada Mei, 0,25 m3/s pada Juni, 0,21 m3/s pada Juli, 0,15 m3/s pada Agustus, 0,10 m3/s pada September, 0,08 m3/s pada Oktober, 0,21 m3/s pada November, 0,25 m3/s pada Desember. Pembangunan PLTA Upper Cisokan dapat memenuhi kebutuhan air bagi warga di sekitar berdasarkan pada daya penelitian ini potensi energi probabilitas yang diambil memiliki range nilai dari 30% sampai 95% dengan nilai faktor kapasitas senilai 70,35%.
The construction of the Cisokan Hydropower Plant is a National Strategic Project in the framework of accelerating the 5000 MW environmentally friendly power plant that has been launched by the President of the Republic of Indonesia. The 1040MW pumped storage hydropower scheme, will produce considerable electricity during peak load daily needs. With a growth rate of 6-7% per year, electricity demand in the Java-Bali interconnection network is currently served by coal-fired power plants, and the increasing peak demand is met by non-environmentally friendly power plants. The reliable discharge obtained is Q 90 in different months is as follows 0.24 m3/s in January, 0.28 m3/s in February, 0.25 m3/s in March, 0.29 m3/s in April, 0.28 m3/s in May, 0.25 m3/s in June, 0.21 m3/s in July, 0.15 m3/s in August, 0.10 m3/s in September, 0.08 m3/s in October, 0.21 m3/s in November, 0.25 m3/s in December, and 0.29 in an unspecified month. The construction of the Upper Cisokan Hydropower Plant can meet the water needs of local residents based on the power of this study, the probability taken has a range of values from 30% to 95% with a capacity factor value of 70.35%.
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | PLTA Cisokan, Debit Andalan, Potensi Energi Cisokan Hydropower Plant, Reliable Debit, Potential Energy |
Subjects: | Bidang Keilmuan > Teknik Sipil Skripsi |
Divisions: | Fakultas Teknologi Infrastruktur dan Kewilayahan > S1 Teknik SIpil |
Depositing User: | Sudarman |
Date Deposited: | 27 Aug 2025 08:44 |
Last Modified: | 27 Aug 2025 08:44 |
URI: | https://repository.itpln.ac.id/id/eprint/255 |