ANALISIS KOORDINASI PROTEKSI TRANSFORMATOR MENGGUNAKAN ETAP PADA PLTU UPK TARAHAN

Adi, Ramadan Nur and Sari, Dewi Purnama (2022) ANALISIS KOORDINASI PROTEKSI TRANSFORMATOR MENGGUNAKAN ETAP PADA PLTU UPK TARAHAN. Diploma thesis, ITPLN.

[thumbnail of SKRIPSI 201811259 RAMADHAN NUR ADI.pdf] Text
SKRIPSI 201811259 RAMADHAN NUR ADI.pdf
Restricted to Registered users only

Download (5MB)

Abstract

Gangguan arus lebih, gangguan tanah merupakan jenis gangguan yang akan dibahas dalam sistem tegangan menengah 6,3 kV terutama unit Auxiliary Transformator unit 3 yang terdapat di area PLTU UPK Tarahan. Untuk mengatasi gangguan digunakan Relay arus lebih (OCR), Relay gangguan tanah (GFR) dan relay Diferensial, relay akan memberikan perintah kepada CB untuk memutus tegangan. Arus hubung singkat satu fasa ke tanah merupakan gangguan hubung singkat yang paling tinggi sebesar 26.830 kA, pada perhitungan manual sebesar 26.808 kA , gangguan ini dipengaruhi oleh total impedansi yang ada. Relai diferensial akan bekerja saat terjadi gangguan internal, ketika terdapat gangguan pada zona eksternal relai diferensial tidak dapat bekerja untuk mengatasi gangguan, Memerlukan waktu 300ms untuk membaca gangguan pada relay differensial untuk mengkoordinasikan CB Trip secara bersamaan, 412 ms sisi 6,3 kV dan 1521 ms sisi 11 kV pada relay OCR dengan simulasi gangguan 3 fasa dan 473 ms pada simulasi gangguan fasa ke tanah, pada hasil perhitungan didapatkan relay diferensial mengatasi gangguan lebih cepat dengan 125 ms waktu membaca gangguan untuk mengkoordinasikan CB untuk Trip secara bersamaan, 340ms pada sisi outgoing, dan 669 ms pada sisi Incoming OCR sebagai backup apabila relay outgoing gagal bekerja pada simulasi gangguan 3 fasa

Overcurrent faults, earth faults are the types of disturbances that will be discussed in the 6.3 kV medium voltage system, the Auxiliary Transformer unit 3 located in the PLTU UPK Tarahan area. To overcome these disturbances Overcurrent Relay (OCR), Ground Fault Relay (GFR) and Differential Relay, the relay will give orders to the CB to cut off the voltage. The short circuit current line to ground is the highest short circuit fault of 26,830 kA, this disturbance is influenced by the total existing impedance. The differential relay will work when an internal fault occurs, when there is a disturbance in the external zone the differential relay works to overcome the disturbance. It takes 300 ms to read the fault on the differential relay for CB Trip simultaneously, 412 ms on the outgoing side and 1521 ms on the incoming side of the OCR relay with 3 phase fault simulation and 473 ms in the phase to ground fault simulation, the calculation results obtained that the relay overcomes the fault faster with 125 ms fault to overcome the CB fault for Trip simultaneously, 340 ms ongoing side ,and 669 incoming side as a back up

Item Type: Thesis (Diploma)
Uncontrolled Keywords: OCR, GFR, Differensial, Hubung Singkat OCR, GFR , Differential, Short Circuit
Subjects: Skripsi
Bidang Keilmuan > Teknik Elektro
Divisions: Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro
Depositing User: Sudarman
Date Deposited: 20 Oct 2025 07:31
Last Modified: 20 Oct 2025 07:31
URI: https://repository.itpln.ac.id/id/eprint/2600

Actions (login required)

View Item
View Item