Rezfyando, Daffa and Pawenary, Pawenary (2022) KAJIAN KINERJA SISTEM UPS (UNINTERRUPTIBLE POWER SUPPLY) DAN SISTEM DC SUPPLY TERHADAP LAMA WAKTU DISCHARGE BATERAI PADA STEAM TURBIN BLOK 4 PLTGU PRIOK POMU. Diploma thesis, ITPLN.
SKRIPSI 201811187 DAFFA REZFYANDO.pdf
Restricted to Registered users only
Download (6MB)
Abstract
Dalam suatu pembangkit terdapat klasifikasi beban-beban, salah satunya adalah beban essential yang penting dan tidak boleh mati dalam keadaan apapun. Jika pembangkit mengalami blackout maka beban essential pembangkit tersebut akan disuplai sementara oleh sistem UPS dan sistem DC supply sampai dengan emergency diesel generator (EDG) sudah siap digunakan. Pada beban yang menggunakan tegangan AC akan disuplai menggunakan sistem UPS dan pada beban yang menggunakan tegangan DC akan disuplai dengan menggunakan sistem DC supply. Pada PLTGU Priok POMU memiliki beban yang disuplai oleh sistem UPS sebesar 46,92 kW dan beban yang disuplai oleh sistem DC supply sebesar 240,23 kW dengan total daya yang dibutuhkan kedua sistem sebesar 325,78 kW. Kedua sistem tersebut mendapat sumber energi listrik dari baterai bank Steam Turbin (ST) 4-3 Blok 4 PLTGU Priok POMU dengan kapasitas baterai sebesar 1200 Ah, dengan kapasitas baterai tersebut, mampu untuk menyuplai beban untuk kedua sistem waktu discharge yang dihasilkan pada saat kondisi full load kedua sistem selama 0,77 hour atau 46,2 menit. Untuk mengantisipasi kegagalan sistem yang berkepanjangan atau blackout, digunakan metode pengeliminasian beban yang di klasifikasikan menjadi beban yang sangat penting, yaitu kontrol panel unit pembangkit, data sistem, motor pelumas turbin. Setelah melakukan eliminasi beban maka diperoleh daya total beban sistem UPS dan sistem DC supply sebesar 287,35 kW dan waktu discharge baterai selama 0,86 hour atau 51,6 menit. Dengan menggunakan metode eliminasi beban maka diperoleh peningkatan waktu dischargei selama 5,4 menit.
In a power plant there is a classification of loads, one of which is an essential load which is important and cannot be turned off under any circumstances. If the generator experiences a blackout, the essential load of the power plant will be temporarily supplied by the UPS system and the DC supply system until the emergency diesel generator (EDG) is ready for use. Loads that use AC voltage will be supplied using a UPS system and loads that use DC voltage will be supplied using a DC supply system. The PLTGU Priok POMU has a load supplied by the UPS system of 46.92 kW and a load supplied by the DC supply system of 240.23 kW with a total power required for both systems of 325.78 kW. Both systems receive electrical energy from the Steam Turbine (ST) 4-3 Block 4 PLTGU Priok POMU battery bank with a battery capacity of 1200 Ah, with this battery capacity, capable of supplying the load for both systems when the discharge time is full. load both systems for 0.77 hours or 46.2 minutes. To anticipate a prolonged system failure or blackout, a load elimination method is used which is classified into a very important load, namely the control panel of the generating unit, system data, turbine lubricating motor. After eliminating the load, the total load power of the UPS system and DC supply system is 287.35 kW and the battery discharge time is 0.86 hours or 51.6 minutes. By using the load elimination method, an increase in discharge time is obtained for 5.4 minutes.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | Uninterruptible Power Supply(UPS), Sistem DC Supply, Baterai, Waktu discharge baterai. Uninterruptible Power Supply(UPS), DC Supply System, Battery, Battery Discharge Time. |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Elektro |
| Divisions: | Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro |
| Depositing User: | Sudarman |
| Date Deposited: | 20 Oct 2025 08:22 |
| Last Modified: | 20 Oct 2025 08:22 |
| URI: | https://repository.itpln.ac.id/id/eprint/2614 |