KAJIAN SIMULASI ALIRAN DAYA PADA SISTEM DISTRIBUSI DI GARDU INDUK ABADI GUNA PAPAN WILAYAH UP3 MENTENG

Marsyaregina, Syelvine and Azzahra, Septianissa (2022) KAJIAN SIMULASI ALIRAN DAYA PADA SISTEM DISTRIBUSI DI GARDU INDUK ABADI GUNA PAPAN WILAYAH UP3 MENTENG. Diploma thesis, ITPLN.

[thumbnail of SKRIPSI 201811188 SYELVINE MARSYAREGINA.pdf] Text
SKRIPSI 201811188 SYELVINE MARSYAREGINA.pdf
Restricted to Registered users only

Download (5MB)

Abstract

Studi aliran daya penentuan atau perhitungan tegangan, arus, daya aktif, faktor daya dan daya reaktif yang terdapat pada berbagai titik dalam suatu jaringan sistem tenaga listrik pada keadaan pengoperasian normal baik yang sedang berjalan maupun yang direncanakan di masa yang akan datang. Aplikasi yang digunakan untuk simulasi aliran daya adalah Electric Transient Analysis Program (ETAP) merupakan suatu perangkat lunak yang mendukung sistem tenaga listrik. Perangkat ini mampu bekerja dalam keadaan offline untuk simulasi tenaga listrik, online untuk pengelolaan data real-time atau digunakan untuk mengendalikan sistem secara real-time. Dari penelitian, kabel 242 dengan data tertinggi didapat persen pembebanan sebesar 35% dengan voltage drop sebesar 0,15%, rugi-rugi daya aktif sebesar 7,43 kW dan rugi-rugi daya reaktif sebesar 47,88 Kvar sehingga dapat dilihat bahwa jatuh tegangan dan rugi-rugi daya yang terjadi masi dalam keadaan batas normal.

The study of power flow determination or calculation of voltage, current, active power, power factor and reactive power found at various points in an electric power system network under normal operating conditions, both currently running and planned in the future. The application used for power flow simulation is the Electric Transient Analysis Program (ETAP) which is a software that supports electric power systems. This device is capable of working offline for power simulation, online for real-time data management or used to control the system in real-time. From the research, cable 242 with the highest data obtained percent loading of 35% with a voltage drop of 0.15%, active power losses of 7.43 kW and reactive power losses of -47.88 Kvar so it can be seen that the fall voltage and power losses that occur are still within normal limits.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: aliran daya, ETAP, faktor daya ower flow, ETAP, power factor
Subjects: Skripsi
Bidang Keilmuan > Teknik Elektro
Divisions: Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro