ANALISIS PERENCANAAN PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) SISTEM OFF GRID DENGAN KAPASITAS 4 kWp MENGGUNAKAN BEBAN SKALA RUMAH TANGGA AREA PEMANIKAN

Patiung, Lifely and Hasanah, Aas Wasri and Yogianto, Aloysius Agus (2022) ANALISIS PERENCANAAN PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) SISTEM OFF GRID DENGAN KAPASITAS 4 kWp MENGGUNAKAN BEBAN SKALA RUMAH TANGGA AREA PEMANIKAN. Diploma thesis, ITPLN.

[thumbnail of SKRIPSI 201811212 LIFELY PATIUNG.pdf] Text
SKRIPSI 201811212 LIFELY PATIUNG.pdf
Restricted to Registered users only

Download (1MB)

Abstract

Potensi energi terbarukan yang cukup besar untuk dikembangkan di Indonesia terutama pada bidang pembangkit listrik tenaga surya (PLTS), dengan posisi Indonesia di garis khatulistiwa sehingga sangat mendukung didalam pemasangan pembangkit listrik tenaga surya. Dalam analisis kelayakan pembangkit listrik tenaga surya (PLTS) di Desa Pemanikan menggunakan sistem off grid dengan memasang 18unit modul yang berkapasitas 150Wp, 24unit baterai 12V 100Ah,1 buah inverter 2000 Watt dan 1 buah SCC. Untuk pemakaian beban total dari rata-rata keseluruhan beban harian untuk 3 rumah dibutuhkan adalah 3,04 kWh. Dalam rancangan ini menggunakan perangkat lunak homer pro untuk memperoleh data iradiasi matahari yang terintegrasi dari NASA dan menganalisis optimasi dari segi ekonomi, melaui perangkat lunak homer pro biaya investasi awal yang dibutuhkan sebesar Rp 186,149,800,00 hasil simulasi kelayakan optimasi dan ekonomi pada perangkat lunak Homer Pro dilihat dari sisi teknis, yaitu energi yang dihasilkan adalah 4,241 kWh/tahun, apabila dibandingkan dengan penggunaan diesel dengan harga investasi awal Rp 43.430.212.614,98 yang mana harga energi Rp 1.844.746,00/kWh, sehingga dapat dikatakan pemasangan PLTS off grid dengan kapasitas 4 kWp dapat dikerjakan dan lebih efisien dibandingkan dengan diesel.

The potential for renewable energy is quite large to be developed in Indonesia, especially in the field of solar power plants, with Indonesia's position on the equator so that it is very supportive in the installation of solar power plants. In the feasibility analysis of solar power plants in Pemanikan Village using an off grid system by installing 18 units of modules with a capacity of 150Wp, 24 units of 12V 100Ah batteries, 1 piece of 2000Watt inverter and 1 SCC. For total load consumption of the overall average daily load for 3 houses required is 3.04 kWh. In this design, it uses homer pro software to obtain integrated solar irradiation data from NASA and analyze optimization in terms of economics, through homer pro software the initial investment cost required is IDR 186,149,800.00 the results of simulating the feasibility of optimization and economics in Homer Pro software in terms of technical terms, namely the energy produced is 4,241 kWh / year, when compared to the use of diesel with an initial investment price of IDR 43,430,212,614.98, where the energy price is IDR 1,844,746.00 / kWh, so it can be said that the installation of an off-grid solar power plant with a capacity of 4 kWp can be done and more efficient than diesel.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: PLTS,off grid, Homer Pro, Diesel Solar, off grid, Homer Pro, diesel
Subjects: Skripsi
Bidang Keilmuan > Teknik Elektro
Divisions: Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro
Depositing User: Sudarman
Date Deposited: 21 Oct 2025 04:02
Last Modified: 21 Oct 2025 04:02
URI: https://repository.itpln.ac.id/id/eprint/2655

Actions (login required)

View Item
View Item