ANALISIS KINERJA TURBIN GAS SEBELUM DAN SESUDAH RELOKASI PADA PLTG PESANGGARAN BALI UNIT5

WIDODO, PANGGULURIGIT and Ridwan, Muhammad (2023) ANALISIS KINERJA TURBIN GAS SEBELUM DAN SESUDAH RELOKASI PADA PLTG PESANGGARAN BALI UNIT5. Diploma thesis, ITPLN.

[thumbnail of 202112065-Panggulu Rigit Widodo.pdf] Text
202112065-Panggulu Rigit Widodo.pdf
Restricted to Repository staff only

Download (5MB)

Abstract

Pembangkit Listrik Tenaga Gas (PLTG) merupakan salah satu desain pembangkit
listrik yang handal cepat dan tidak terlalu rumit dalam pengoperasian, hal ini yang
menjadikan pertimbangan PT PLN (Persero) melakukan upaya terobosan dalam
mengoptimalkan ketersediaan energi listrik dengan kebutuhan akan energi listrik yang
semakin meningkat dengan seiring bertumbuhnya tingkat perekonomian suatu daerah.
Pemerintah melalui PT PLN (Persero) melakukan upaya optimalisasi unit pembangkit listrik yang berstatus standby pada daerah yang telah tercukupi kebutuhan energi
listriknya dengan memindah (relokasi) unit tersebut ke daerah yang masih
membutuhkan suplai energi listrik. Sebagai contoh di Pulau Bali, PT PLN (Persero)
melalui PT. Indonesia Power melakukan relokasi unit Pembangkit Listrik Tenaga Gas
(PLTG) Grati ke Pesanggaran Bali dalam rangka penguatan sistem kelistrikan Bali
guna mendukung event KTT G20 pada tahun 2022.Relokasi unit PLTG Grati Pasuruan ke Pesanggaran Bali ini berlangsung selama 4 bulan terhitung mulai bulan Juli 2022 dan berhasil COD pada tanggal 27 Oktober 2022 sebelum pelaksanaan KTT G20 dimulai. PLTG ini merupakan salah satu bagian konfigurasi dari PLTGU Blok 1 Grati yang telah beroperasi sejak tahun 1996.PLTGU Grati terdiri dari 3 unit turbin gas dan 1 turbin uap. Turbin gas tipe MW-701 ini diproduksi oleh Mitsubishi Corporation pada tahun 1995 dengan kapasitas terpasang masing-masing unit adalah 113,84 MW dengan nilai heat rate saat awal komisioning adalah 2781 kCal/kWh
Gas Turbine Power Plant (PLTG) is one of the power plant designs that is reliable,
fast and not too complicated in operation, this is what makes PT PLN (Persero)
consider making breakthrough efforts in optimizing the availability of electrical
energy with the increasing need for electrical energy along with the growing
economic level of a region. The government through PT PLN (Persero) makes efforts
to optimize power generation units that have standby status in areas that have met
their electrical energy needs by relocating these units to areas that still need
electrical energy supply. For example, on the Bali Island, PT PLN (Persero)
relocated the Grati Gas Power Plant (PLTG Grati) to Pesanggaran Bali in order to
strengthen Bali's electricity system to support the G20 Summit event in 2022.
The relocation of the Grati PLTG unit lasted for 4 months starting in July 2022 and
successfully carried out the Comercial Operation Date (COD) on October 27, 2022
before the G20 Summit began. This PLTG is one of the configuration parts of PLTGU
Block 1 Grati which has been operating since 1996. PLTGU Grati consists of 3 gas
turbine units and 1 steam turbine. This gas turbine is MW-701 type was produced by
Mitsubishi Corporation in 1995 with the installed capacity of each unit is 113.84 MW
with a turbine heat rate value at the beginning of commissioning is 2781 kCal / kWh

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Relokasi PLTG, Efisiensi Turbin Gas, Kinerja Turbin Gas. PLTG Relocation, Gas Turbine Efficiency, Gas Turbine Performance
Subjects: Skripsi
Bidang Keilmuan > Teknik Mesin
Divisions: Fakultas Teknologi dan Bisnis Energi > S1 Teknik Mesin
Depositing User: Nurul Hidayati
Date Deposited: 28 Aug 2025 02:42