Suprobo, Dwi Anjas and Fernandes, Alex (2022) ANALISIS METODE SISIP TRAFO, PECAH BEBAN DAN UPRATING TRAFO UNTUK MENGATASI OVERLOAD PADA TRANSFORMATOR DISTRIBUSI DI UP3 PONDOK KOPI - PT. PLN (PERSERO). Diploma thesis, ITPLN.
SKRIPSI 201811019 DWI ANJAS SUPROBO.pdf
Restricted to Registered users only
Download (1MB)
Abstract
Di zaman serba digital ini energi listrik menjadi hal yang sangat penting untuk memenuhi kebutuhan masyarakat. Ada saja gangguan yang terjadi seperti gangguan overload transformator distribusi yang terjadi di UP3 Pondok Kopi-PT. PLN (Persero). Gangguan overload ini adalah kondisi dimana pembebanan pada transformator sudah melebihi 80% dari kapasitasnya. Ada 3 metode yang bisa dilakukan untuk mengatasi permasalahan overload yaitu dengan sisip trafo, pecah beban dan uprating trafo. Penelitian bertujuan untuk mengetahui bagaimana cara terbaik untuk mengatasi transformator distribusi yang mengalami overload dan berapa nilai persentase pembebanan pada transformator distribusi ketika mengalami oveload dan ketika sudah tidak mengalami overload. Penelitian ini menggunakan metode kuantitatif komparatif dengan melakukan perhitungan persentase pembebanan dengan data yang diperoleh kemudian menganalisa dan mencari metode mana yang terbaik dan efisien untuk mengatasi gangguan overload di transformator distribusi KD122. Hasil penelitian ini menunjukkan bahwa secara analisis perhitungan semua metode bisa dilakukan. Tetapi metode terbaik untuk mengatasi permasalahan overload transformator KD122 menggunakan metode uprating karena mudah dilakukan, walaupun dari segi finansial mahal tetapi jika ditinjau dari efisiensi waktu dan lahan metode ini lebih baik. Hasil persentase pembebanan pada transformator distribusi di malam hari ketika mengalami overload sebesar 82,8%. Ketika sudah tidak mengalami overload persentase pembebananya sebesar 52,6%.
In this digital era, electrical energy is very important to meet people's needs. Some disturbances occur, such as the distribution transformer overload disturbance that occurred at UP3 Pondok Kopi-PT. PLN (Persero). This overload disturbance is a condition where the load on the transformer has exceeded 80% of its capacity. There are 3 methods that can be done to overcome the problem of overload, namely by inserting the transformer, breaking the load and uprating the transformer. The research aims to find out how best to overcome distribution transformers that are overloaded and what is the percentage value of loading on distribution transformers when they are overloaded and when they are not overloaded. This study uses a comparative quantitative method by calculating the percentage of loading with the data obtained and then analyzing and finding which method is the best and most efficient to overcome overload disturbances in the distribution transformer KD122. The results of this study indicate that the calculation analysis of all methods can be done. But the best method to overcome the problem of overloading the KD122 transformer is using the uprating method because it is easy to do, even though it is expensive from a financial point of view, but from a time and land efficiency perspective, this method is better. The result of the percentage of loading on the distribution transformer at night when it is overloaded is 82.8%. When it is not overloaded, the percentage of the load is 52.6%
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | Sistem distribusi, Transformator distribusi, Beban lebih Distribution System, Distribution Transformer, Overload |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Elektro |
| Divisions: | Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro |
| Depositing User: | Sudarman |
| Date Deposited: | 23 Oct 2025 07:05 |
| Last Modified: | 23 Oct 2025 07:05 |
| URI: | https://repository.itpln.ac.id/id/eprint/2852 |