KENARA, REZA and Husada, Hendrianto (2022) ANALISIS RUGI-RUGI DAYA DAN JATUH TEGANGAN SISTEM JARINGAN DISTRIBUSI 20 kV MENGGUNAKAN ETAP 16 PADA PENYULANG AK-06 ULP TAKENGON. Diploma thesis, ITPLN.
SKRIPSI 201811007 REZA KENARA.pdf
Restricted to Registered users only
Download (3MB)
Abstract
Sistem distribusi adalah sistem tenaga listrik yang menyalurkan energi listrik dari pembangkit hingga ke pelanggan PLN. Pada penelitian ini peneliti melakukan analisa rugi rugi daya dan jatuh tegangan menggunakan simulasi ETAP 16 pada penyulang AK06 Pamar, sebelum dilakukan tentunya peneliti akan mencari informasi dan data-data yang dibutuhkan, sehingga data-data akan disimulasikan melalui software ETAP 16. Dari simulasi ETAP 16 didapati pada penyulang AK06 Pamar ini mengalami rugi rugi daya yang dimana terbagi atas jatuh tegangan yang terdapat dibeberapa gardu distribusi dimana belum sesuai dengan S-PLN (-10% - +5) Dan solusi dalam memperbaiki jatuh tegangan yang terjadi pada setiap gardu distribusi ini dapat dilakukan dengan cara melakukan tap changer pada Transformator (T39) dan pemasangan kapasitor pada bus PLTMH Pamar dan RAT 34/ TRANS 2 Pamar. Sehingga setelah dilakukannya perbaikan menggunakan tap changer dan pemasangan kapasitor bank, maka jatuh tegangan pada beberapa gardu distribusi terperbaiki tegangannya. Terdapat juga losses kabel 14 yang awalnya rugi rugi terjadi sebesar 63,8 kW dengan cara memperbesar luas penampang dari kabel CU 75mm² menjadi kabel 120 mm² rugi rugi menjadi turun 37,2 kW, pada kabel 13 rugi rugi awalnya 61,2 kW menjadi 35,4 kW dan pada kabel 15 rugi rugi awalnya 54,0 kW menjadi 32,2 kW, disimpulkan bahwa dengan memperbesar luas penampang penghantar dapat mengurangi rugi rugi yang terjadi pada kabel tersebut.
The distribution system is an electric power system that distributes electrical energy from the generator to PLN customers. In this study, researchers conducted an analysis of power losses and voltage drops using the ETAP 16 simulation on the Pamar AK06 feeder, before doing this, of course, the researchers would look for the information and data needed, so that the data will be simulated through the ETAP 16 software. From the ETAP 16 simulation it was found that the Pamar AK06 feeder experienced a power loss which was divided into the voltage drop found in several distribution substations which were not in accordance with PLN standards (-10% - +5). by doing a tap changer on the Transformer (T39) and installing capacitors on the Pamar PLTMH bus and RAT 34/ TRANS 2 Pamar. So that after repairs using a tap changer and the installation of a capacitor bank, the voltage drop at several distribution substations is corrected. And there are also losses for cable 14, which initially lost 63.8 kW by increasing the cross-sectional area of the 75mm² CU cable to 120mm² cable, the loss decreased to 37.2 kW, on cable 13 the initial loss was 61.2 kW to 35, 4 kW and on cable 15 the initial loss was 54.0 kW to 32.2 kW. It was concluded that by increasing the cross-sectional area of the conductor, the losses incurred in the cable could be reduced.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | Rugi Rugi Daya, Jatuh Tegangan, Losses, Jaringan Tegangan Menengah (JTM), Tap Changer, Kapasitor Bank, ETAP 16 Power Loss, Relationship Fall, Losses, Medium Relationship Network (JTM), Tap Changer, Capacitor Bank, ETAP 16 |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Elektro |
| Divisions: | Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro |
| Depositing User: | Sudarman |
| Date Deposited: | 24 Oct 2025 04:03 |
| Last Modified: | 24 Oct 2025 04:03 |
| URI: | https://repository.itpln.ac.id/id/eprint/2898 |
