STUDI PERBAIKAN OVERLOAD TRANSFORMATOR DISTRIBUSI DAN JATUH TEGANGAN DENGAN METODE SISIP TRANSFORMATOR DI PT PLN (PERSERO) ULP KURANJI

Listiani, Suci and Samsurizal, Samsurizal (2024) STUDI PERBAIKAN OVERLOAD TRANSFORMATOR DISTRIBUSI DAN JATUH TEGANGAN DENGAN METODE SISIP TRANSFORMATOR DI PT PLN (PERSERO) ULP KURANJI. Diploma thesis, ITPLN.

[thumbnail of SKRIPSI 202111314 SUCI LISTIANI.pdf] Text
SKRIPSI 202111314 SUCI LISTIANI.pdf
Restricted to Registered users only

Download (6MB)

Abstract

Pada Sistem pengoperasian tenaga listrik, kita memerlukan adanya kualitas pelayanan yang baik. Salah satu contohnya yaitu memberikan nilai tegangan yang baik kepada pelanggan dan tidak adanya gangguan voltage drop. Penelitian ini menggunakan metode kuantitatif, yaitu prosedur penelitian yang menghasilkan data dalam bentuk numerik yang dapat diambil dan dianalisis. Pada Gardu AB013FDB0218T yang terletak di Jalur II Filano Jl.Parak Karakah pada Penyulang Anduring wilayah kerja dari PT PLN (Persero) ULP Kuranji. Dalam data pembebanannya mencapai 95,02% (±95,02 kVA) dari kapasitasnya yaitu 100 kVA dengan tegangan ujung dari gardu mengalami penurunan daripada semestinya sebesar 196 V atau mengalami penurunan tegangan (drop voltage) sebesar Fasa R 11,95%, Fasa S 11,06%, dan Fasa T 14,03%. Pembebanan dan jatuh tegangan tersebut sudah melampaui dari kapasitas maksimum trafo standar 80% (SPLN 50/1997) dan jatuh tegangan -10% (SPLN 1 Tahun 1995), yang berpotensi pada kerugian secara material dan finansial bagi PT PLN (Persero) ULP Kuranji. Oleh karena itu, perlu dilakukannya perbaikan di daerah tersebut dengan menggunakan metode trafo sisip. Metode ini dilakukan dengan cara memindahkan beban kepada trafo sisip dengan kapasitas 50 KVA, sehingga beban yang ditopang oleh trafo ini tidak overload dan tidak mengalami jatuh tegangan. Hasil perhitungan yang didapat setelah ditambahkan trafo sisip yaitu persen pembebanan sebelum 95,02% menjadi 69,45%. Presentase jatuh tegangan berdasarkan perhitungan sebelum penambahan trafo sisip Fasa R 11,24% setelah penambahan trafo sisip menjadi Fasa R 5,04%. Fasa S 10,36% menjadi 5,54%, Fasa T 13,63% menjadi 6,86%. Hasil Simulasi ETAP setelah penambahan trafo sisip pembebanan sebelum 87,2% menjadi 65,2%. Presentase jatuh tegangan berdasarkan simulasi yaitu fasa R 15,31% setelah penambahan trafo sisip menjadi Fasa R 8,65%. Fasa S 15,31% menjadi 8,63%, Fasa T 15,31% menjadi 8,63%. Dari hasil tersebut dapat dikatakan bahwa pembebanan dan jatuh tegangan sudah memenuhi standar SPLN setelah dilakukan penambahan trafo sisip dengan kapasitas 50 kVA.

In the electric power operating system, we need a good quality of service. One example is providing a good voltage value to customers and the absence of voltage drop interference. This research uses quantitative methods, which are research procedures that produce data in numerical form that can be taken and analyzed. At Substation AB013FDB0218T which is located on Line II Filano Jl.Parak Karakah on Anduring Repeater of the working area of PT PLN (Persero) ULP Kuranji. In the loading data, it reaches 95.02% (± 95.02 kVA) of its capacity of 100 kVA with the end voltage of the substation decreasing than it should be by 196 V or experiencing a voltage drop of Phase R 11.95%, Phase S 11.06%, and Phase T 14.03%. The loading and voltage drop have exceeded the maximum capacity of the standard transformer of 80% (SPLN 50/1997) and a voltage drop of -10% (SPLN 1 Year 1995), which has the potential for material and financial losses for PT PLN (Persero) ULP Kuranji. Therefore, it is necessary to make improvements in the area by using the insert transformer method. This method is done by moving the load to the insert transformer with a capacity of 50 KVA, so that the load supported by this transformer is not overloaded and does not experience voltage drops. The calculation results obtained after adding the insert transformer are the percent of loading before 95.02% to 69.45%. The percentage of voltage drop based on the calculation before the addition of the insert transformer R phase 11.24% after the addition of the insert transformer becomes R phase 5.04%. Phase S 10.36% to 5.54%, Phase T 13.63% to 6.86%. ETAP Simulation results after the addition of the insert transformer loading before 87.2% to 65.2%. The percentage of voltage drop based on simulation is phase R 15.31% after the addition of the insert transformer to phase R 8.65%. Phase S 15.31% to 8.63%, Phase T 15.31% to 8.63%. From these results it can be said that the loading and voltage drop have met SPLN standards after adding an insert transformer with a capacity of 50 kVA..

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Jatuh Tegangan, Trafo Sisip, Tegangan Rendah Voltage Drop, Insert Transformer, Low Voltage
Subjects: Skripsi
Bidang Keilmuan > Teknik Elektro
Divisions: Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro
Depositing User: Sudarman
Date Deposited: 27 Oct 2025 07:11
Last Modified: 27 Oct 2025 07:11
URI: https://repository.itpln.ac.id/id/eprint/2984

Actions (login required)

View Item
View Item