PERENCANAAN SISTEM PEMBANGKIT LISTRIK TENAGA SURYA ON-GRID PADA ATAP GEDUNG KANTOR WALIKOTA PEMATANGSIANTAR

Sihombing, Risky Ramadhony and Hidayat, Syarif (2024) PERENCANAAN SISTEM PEMBANGKIT LISTRIK TENAGA SURYA ON-GRID PADA ATAP GEDUNG KANTOR WALIKOTA PEMATANGSIANTAR. Diploma thesis, ITPLN.

[thumbnail of SKRIPSI 202011224 RISKY RAMADHONY SIHOMBING.pdf] Text
SKRIPSI 202011224 RISKY RAMADHONY SIHOMBING.pdf
Restricted to Registered users only

Download (5MB)

Abstract

Lokasi area gedung kantor walikota pematangsiantar berlokasi di Jl. Merdeka No.10, Proklamasi, Kec. Siantar Bar., Kota Pematang Siantar, Sumatera Utara 21135 dengan koordinat lintang utara 2.9567777026406827 dan lintang Selatan 99.06169458000487. yang berupa bangunan dengan atap seluas 300 m² yang berada di area kantor walikota pematangsiantar. Potensi energi matahari di Indonesia tergolong tinggi karena secara geografis negara ini menerima radiasi matahari sepanjang tahun dan durasi penyinaran 6- 8 jam per hari, lokasi penelitian memiliki Iradiasi sebesar 4.75 kWh/m² per hari dan Peak Sun Hour (PSH) sebesar 4,75 jam. Penelitian ini menggunakan metode eksperimental desain melalui perhitungan matematis dan simulasi dengan Software PVSysyt serta perhitungan analisis biaya. Perhitungan teknis dan simulasi menggunakan Software PVSysyt dilakukan untuk dapat memperkirankan produksi energi listrik yang didapatkan dari PLTS. Berdasarkan beban daya pada perangkat elektronik yang ada di kantor walikota pematangsiantar, maka PLTS ini menghasilkan daya sebesar 15,4 kWp dengan 28 unit panel surya Trina Solar 550 Wp dan 1 buah inverter daya sebesar 20 kW yang dirangkain secara 2 string paralel dan terdapat 14 buah panel surya pada setiap stringnya. Produksi energi yang dihasilkan berdasarkan perhitungan sebesar 22.712,125 kWh per tahun dengan performance ratio 85 % dan energi yang dihasilkan berdasarkan simulasi sebesar 22.187 kWh per tahun dengan performance ratio 83,14%.

The office building of the Mayor of Pematangsiantar is located at Jl. Merdeka No.10, Proklamasi, Kec. Siantar Bar., Kota Pematang Siantar, Sumatera Utara 21135 with coordinates 2.9567777026406827 N and 99.06169458000487 E. This building, with a roof area of 300 m², is part of the office complex of the Mayor of Pematangsiantar. The potential for solar energy in Indonesia is considered high due to the country's geographical location, which receives solar radiation throughout the year and has an average sunshine duration of 6-8 hours per day. The research location has an irradiance of 4.75 kWh/m² per day and a Peak Sun Hour (PSH) of 4.75 hours. This study uses an experimental design method through mathematical calculations and simulations with PVsyst software, along with cost analysis calculations. Technical calculations and simulations using PVsyst software are performed to estimate the electricity production from the Solar Power Plant (PLTS). Based on the power load of electronic devices at the Mayor’s office, the PLTS generates a power output of 15.4 kWp with 28 Trina Solar 550 Wp solar panels and one 20 kW inverter, arranged in 2 parallel strings with 14 solar panels in each string. The estimated energy production is 22,712.125 kWh per year with a performance ratio of 85%, and the energy produced based on simulation is 22,187 kWh per year with a performance ratio of 83.14%.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: PLTS, Produksi energi, Simulasi, PVSyst. PLTS, Energy production, Simulation, PVsyst
Subjects: Skripsi
Bidang Keilmuan > Teknik Elektro
Divisions: Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro
Depositing User: Sudarman
Date Deposited: 29 Oct 2025 03:46
Last Modified: 29 Oct 2025 03:46
URI: https://repository.itpln.ac.id/id/eprint/3105

Actions (login required)

View Item
View Item