STUDI KELAYAKAN KAPASITAS PEMUTUS TENAGA GIS 150 KV KETAPANG MENGGUNAKAN ETAP 16

Setiadi, Ahmad and Kartiria, Kartiria (2024) STUDI KELAYAKAN KAPASITAS PEMUTUS TENAGA GIS 150 KV KETAPANG MENGGUNAKAN ETAP 16. Diploma thesis, ITPLN.

[thumbnail of SKRIPSI 202011230 AHMAD SETIADI.pdf] Text
SKRIPSI 202011230 AHMAD SETIADI.pdf
Restricted to Registered users only

Download (6MB)

Abstract

Pemutus tenaga berfungsi untuk memutus atau menghubungkan arus listrik pada saat kondisi normal maupun terjadi gangguan. Gangguan yang terjadi umumnya adalah hubung singkat. Dalam keadaan normal pemutus tenaga dialiri arus dengan arus nominal beban, sedangkan pada saat terjadi gangguan pemutus tenaga dialiri arus yang sangat besar. Oleh karena itu kemampuan suatu pemutus tenaga untuk memutus arus dapat dipertimbangkan. Tujuan penelitian ini untuk mengetahui kelayakan kapasitas dari pemutus tenaga dengan metode penelitian membandingkan hasil perhitungan arus hubung singkat dengan simulasi hubung singkat pada ETAP, serta melakukan perhitungan dan simulasi relay OCR. Didapat hasil perhitungan hubung singkat terbesar terjadi pada gangguan hubung singkat 3 fasa dengan nilai 18,612194 kA, untuk hasil simulasi hubung singkat terbesar terjadi pada gangguan 3 fasa dengan nilai 12,488 kA, dengan demikian terdapat selisih perbandingan sebesar 0,49%. Pada kelayakan kapasitas pemutus tenaga dengan nilai 29,779510 kA maka dapat dikatakan baik karena sesuai dengan rating PMT pada GIS 150 kV Ketapang arah GI Mangga Besar.

The power breaker functions to cut off or connect the electric current during normal conditions or disturbances. The disruption that occurs is generally short circuit. Under normal circumstances, the power breaker is flowed with a nominal current of the load, while when there is a power breaker disturbance, a very large current is flown. Therefore, the ability of a power breaker to cut off the current can be considered. The purpose of this study is to determine the feasibility of the capacity of the power breaker by comparing the results of short-circuit current calculations with short-circuit simulations in ETAP, as well as to perform OCR relay calculations and simulations. The results of the calculation of the largest short circuit occurred in a 3-phase short circuit fault with a value of 18.612194 kA, for the results of the largest short circuit simulation occurred in a 3-phase fault with a value of 12.488 kA, thus there was a difference of 0.49%. On the feasibility of the power breaker capacity with a value of 29.779510 kA, it can be said to be good because it is in accordance with the PMT rating on the GIS 150 kV Ketapang direction GI Mangga Besar.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Pemutus tenaga (PMT), gangguan hubung singkat, OCR (Over Current Relay) Power cut-off (PMT), short circuit interference, OCR (Over Current Relay)
Subjects: Skripsi
Bidang Keilmuan > Teknik Elektro
Divisions: Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro