Abstract

Air merupakan salah satu kebutuhan yang sangat penting di berbagai kegiatan kebutuhan baik itu untuk keperluan domestik maupun non domestik. Banyaknya pekerjaan infrastruktur di area proyek PLTA Upper Cisokan Pumped Storage (UCPS) menyebabkan munculnya usulan mengenai upaya pemanfaatan Sumber Daya Air (SDA) di dalam memenuhi kebutuhan proyek terutama untuk keperluan non domestik. Sungai Cirumamis menjadi salah satu Sumber Daya Air (SDA) yang dimanfaatkan sebagai Sungai yang memberikan pasokan air pada lokasi pekerjaan yang ada di PLTA UCPS tepatnya pada pekerjaan Roller Compacted Concrate (RCC) dan Compact Vacum Concrate (CVC). Metode pengambilan air dari sungai menuju lokasi proyek adalah dengan memanfaatkan pompa air yang kemudian akan di tampung dalam bak penampungan yang ada. Pasokan air pada Sungai ini mencapai debit maksimum tertinggi pada tahun 2023 yaitu sebesar 43,48m3/dt. Pasokan air yang dibutuhkan dalam area pekerjaan RCC dan CVC mencapai volume sebesar 71.364 liter yang digunakan untuk beberapa keperluan seperti instalasi beton, perendaman beton serta keperluan non domestik lainnya di luar keperluan air minum. Berdasarkan analisis neraca air ketersediaan air yang ada pada sungai dapat memenuhi kebutuhan air pada pekerjaan dilihat dari data tahunan pada tahun 2023 yang menjelaskan total inflow sebesar 7.299.088 liter sedangkan outflow hanya sebesar 71.364 liter. dari data tersebut diperoleh gambaran bahwa perolehan inflow dari debit air yang ada dapat memenuhi standar pekerjaan dalam proyek.

Water is a very important need in various activities, both for domestic and non domestic purposes. The large amount of infrastructure work in the Upper Cisokan Pumped Storage (UCPS) hydropower project area has led to the emergence of proposals regarding efforts to utilize Water Resources (SDA) to meet project needs, especially for non-domestic needs. The Cirumamis River is one of the Water Resources (SDA) which is used as a river that provides water supply at work locations at the UCPS hydropower plant, specifically at Roller Compacted Concrate (RCC) and Compact Vacum Concrate (CVC) work. The method for taking water from the river to the project location is by using a water pump which will then be stored in an existing reservoir. The water supply in this river will reach its highest maximum discharge in 2023, namely 43.48 m3/sec. The water supply required in the RCC and CVC work area reaches a volume of 71,364 liters which is used for several purposes such as concrete installation, concrete soaking and other non-domestic needs outside of drinking water needs. Based on the water balance analysis, the availability of water in the river can meet the water needs of the work, seen from annual data in 2023 which shows that the total inflow is 7,299,088 liters while the outflow is only 71,364 liters. From this data, we get an idea that the inflow obtained from the existing water discharge can meet the work standards in the project.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Sumber Daya Air, Pemanfaatan Sumber Daya Air, Keperluan air non domestik Water Resources, Utilization of Water Resources, Non domestic water needs.
Subjects: Bidang Keilmuan > Teknik Sipil
Skripsi
Divisions: Fakultas Teknologi Infrastruktur dan Kewilayahan > S1 Teknik SIpil
Depositing User: Sudarman
Date Deposited: 28 Aug 2025 04:13
Last Modified: 28 Aug 2025 04:13
URI: https://repository.itpln.ac.id/id/eprint/312

Actions (login required)

View Item
View Item