Hari, Zuhairsan Aldino and Kartiria, Kartiria (2024) PENGGUNAAN PARTIAL DISCHARGE GUNA MENENTUKAN KESEHATAN KABEL BAWAH TANAH TEGANGAN MENENGAH PADA PENYULANG MITSUBISHI PT. PLN (Persero) UP3 GUNUNG PUTRI. Diploma thesis, ITPLN.
SKRIPSI 202011134 ZUHAIRSAN ALDINO HARI.pdf
Restricted to Registered users only
Download (4MB)
Abstract
Partial Discharge merupakan salah satu penyebab utama kerusakan isolasi kabel sehingga perlu dilakukan assesment kabel. Dari data yang didapat dari hasil pemeliharaan sebelumnya, pada penyulang MITSUBISHI terindikasi kabel yang tidak sehat sehingga dikhawatirkan akan menimbulkan kerugian yang lebih di kemudian hari. Penyebab munculnya masalah pada kabel adalah diketahui dari pengujian Partial Discharge yang tidak memenuhi standar yang telah ditentukan disebabkan oleh beban berlebih, lokasi yang sering dilalui kendaraan berat sehingga memberikan beban mekanis pada kabel tanah. Suhu kabel yang terus-menerus tinggi dapat memicu Partial Discharge, sehingga pemantauan lingkungan sekitar instalasi kabel sangat penting untuk mencegah kerusakan isolasi.Metode yang digunakan adalah dengan melakukan pengujian Partial Discharge dan hasilnya akan dianalisis untuk menentukan jadwal pemeliharaan. Dalam menentukan kesehatan kabel dapat dilihat dari besarnya PDIV dan PD Level dengan digolongkan menjadi beberapa kriteria yaitu kritis apabila PD Level diatas angka 10000 pC dan PDIV dibawah 1 Uo. Kategori Buruk apabila PD Level diatas 500 pC dan PDIV dibawah 1 Uo.
Partial Discharge is one of the main causes of cable insulation damage, making cable assessment necessary. Based on data from previous maintenance results, the MITSUBISHI feeder cables have been identified as unhealthy, raising concerns about potential future losses. The cause of the cable issues was determined through Partial Discharge testing, which did not meet the established standards. This was due to overload and the location frequently being traversed by heavy vehicles, which imposes mechanical stress on the underground cables. The continuously high cable temperature can trigger Partial Discharge, making it crucial to monitor the environment around the cable installation to prevent insulation damage. The method used involves conducting Partial Discharge tests, and the results are analyzed to determine the maintenance schedule. The health of the cables can be assessed by measuring the PDIV (Partial Discharge Inception Voltage) and PD Level, which are classified into several criteria: critical if the PD Level is above 10,000 pC and PDIV is below 1 Uo, and poor if the PD Level is above 500 pC and PDIV is below 1 Uo
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | Assesment kabel, Kabel Bawah Tanah, Partial Discharge, Isolasi Kabel, PD Level Cable Assesment, Underground Cables, Partial Discharge, Cable Insulation, PD Level. |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Elektro |
| Divisions: | Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro |
| Depositing User: | Sudarman |
| Date Deposited: | 03 Nov 2025 02:48 |
| Last Modified: | 03 Nov 2025 02:48 |
| URI: | https://repository.itpln.ac.id/id/eprint/3258 |